5.
Mounting
a.
Note: SpaEclipse™ Dual Voltage models are equipped with a voltage
selector switch on the back of the unit. Set this switch to the appropriate volt-
age (as indicated on the switch) prior to installation. Once the proper voltage has
been selected (comes preset at 230V), cover the switch with the label provided to
prevent tampering (refer to Figure 3).
b.
Mount the Ozone Generator as high as possible within the spa’s protected
equipment area.
c.
Screws are provided for mounting but may not be appropriate for all
surfaces. Substitute proper mounting hardware as required.
d.
For ZO-300, ZO-302 and ZO-301: Attach the Metal Spring Clips to the
mounting surface so that the openings are aligned. Spread the clips so they are
approximately 2 inches from each end. Insert one side of the Ozone Generator
first, then rotate the unit to snap in place.
e.
For all other models, use the mounting features provided on the Ozone
Generator.
6.
Plumbing - Vacuum System (refer to Figure 4)
a.
Most spas are factory equipped with an ozone injector or vacuum port,
like the one shown in Figure 3. Review your Spa’s Installation Manual to identify
the correct ozone connection location.
b.
If the spa is not equipped with a vacuum source, DEL Ozone provides a
wide range of optional installation kits. Contact DEL Customer Service for assis-
tance at 800.676.1335 x 249.
7.
Plumbing - Ozone Generator (refer to Figure 4)
a.
Connect the PVC ozone tubing provided to the hose barb on the Ozone
Generator.
b.
Slide hose clamps onto the tubing and run the tubing to the vacuum source.
i.
If the Ozone Generator is mounted above the water line, tubing
may be run directly to the vacuum source.
ii.
If Ozone Generator is mounted below the water line, run tubing to
a point above the water line and back down to the vacuum source.
Secure Tubing in this position.
Figure 3
Switch Cover Label Application
for SpaEclipse™ Dual Voltage
Voltage Selector
Cover Label
6