background image

        Installation Instructions 

1. Cutout table as required (see Figure 1 & Cutout Sizes)

2. Center OASIS

TM  

UT on cutout from below and mount with screws as shown, not

provided.

3. OASIS

TM

 Inserts may have been installed at the factory but may be repositioned

in the field if desired.  To reposition OASIS

TM

 Inserts remove thumb nuts & washers

from rear and reposition as needed (see Figure 2).  Note: Disconnecting ground

tether may be required.

4. Connect all power & data cabling as needed and check for proper operation.

5. Attach Outer Pan (optional) to underside of table if desired.

Reviews: