Installation Instructions
1. Cutout table as required (see Figure 1 & Cutout Sizes)
2. Center OASIS
TM
UT on cutout from below and mount with screws as shown, not
provided.
3. OASIS
TM
Inserts may have been installed at the factory but may be repositioned
in the field if desired. To reposition OASIS
TM
Inserts remove thumb nuts & washers
from rear and reposition as needed (see Figure 2). Note: Disconnecting ground
tether may be required.
4. Connect all power & data cabling as needed and check for proper operation.
5. Attach Outer Pan (optional) to underside of table if desired.