Sequence
Description
GB ON
Synchronising
GB ON
Blackout closing
GB OFF
Open breaker
GB OFF
De-load/open breaker
GB ON sequence/synchronising
The GB ON sequence can be started when the generator is running and the terminal 25 (start sync./control)
is activated. The regulation will start and control the genset in order to synchronise the breaker.
The busbar voltage must be above 70 % × U
NOM
in order to initiate the synchronising.
Interruption of the GB ON (synchronising) sequence
Input 25 deactivated
Input 43 activated
25 = ON at the same time
Remote GB ON activated
GB close
UBB measured below 70 %
70 % × U
NOM
Synchronising failure
GB close failure
Alarm with Safety stop, Trip GB or Block fail class
When the GB opens, there is a 10 s delay that prevents it from closing immediately after it has
opened. This is to ensure that there is sufficient time to change mode and control inputs.
GB ON sequence/blackout closing
In order to make a blackout closing, terminal 25 must be activated and the measurements from the busbar
must be missing. The breaker will close if the generator voltage is within the settings of 2110 sync. blackout.
The busbar voltage must be below 30 % × U
NOM
in order to initiate the black busbar closing.
Interruption of the GB ON (blackout close) sequence
Input 25 deactivated
Input 43 activated
25 = ON at the same time
Remote GB ON activated
U gen. not OK
Limit set in menu 2112
f gen. not OK
Limit set in menu 2111
Black closing not enabled
Input function configured and input not activated
GB close
UBB measured above 30 %
General failure
Alarm with Safety stop, Trip GB or Block fail class