DPS-1 Installation and operation instructions 4189360002 Rev. C 

Safety precautions 

www.deifwindpower.com 

Page 5 of 14 

2.

 

Safety precautions 

 

Attention 

Company policy and local regulations regarding PPE must always be followed, regardless 
whether the PPE is shown in this manual or not. 

International standards such as IEC 364 and any other relevant international or national 
standard regarding safety must be observed. Only qualified personnel who is fully capable 
of recognizing, understanding and judging the dangers of the task at hand may perform the 
work.  

 

The installation and service of the units should only be handled by qualified persons, who are 
conscious of the risks involved. 

Ensure that the grounded connection wire of the line is correctly connected to the line input of 
the unit. Load and service or measuring setup must be grounded, if possible, in order to 
protect the units and the persons working with them. 

During normal operation, the persons working with the units must have no contact to 
dangerous voltages within the unit. 

2.1

 

Mechanical work 

 

 

2.2

 

Electrical work 

 

 

 

 

Use eye, hand and hearing protection 

Use protection for eyes, hand and hearing, if the mounting holes for bolts need 
to be made during production. 

 

Disconnect power 

Ensure that all power is disconnected when working with the DPS-1, except for during 
commissioning and service. 

 

Danger! 

Risk of burns and electrical shock from short circuit, electrical arc and uninsulated wires. 

Commissioning and maintenance work on this device may only be carried out by a qualified 
electrician. Observe local regulation when working with electrical components. 

When the DPS-1 has been powered, there is a risk of stored energy even when the power 
is disconnected. Wait 5 minutes after the power is disconnected and verify zero energy 
according to company procedures on the outputs before performing any work. 

Summary of Contents for DPS-1

Page 1: ...AND OPERATION INSTRUCTIONS Power supply DPS 1 Document no 4189360002 Rev C Date 2017 06 27 Language EN GB DEIF A S Frisenborgvej 33 DK 7800 Skive Tel 45 9614 9614 Fax 9614 9615 Info deif com www deifw...

Page 2: ...this document is the original language and always contains the most recent and up to date information about the product Translations might not be updated at the same time as the English version DEIF...

Page 3: ...3 1 Package content 6 3 1 1 Standard package content 6 3 2 Required tools and accessories 6 3 3 Handling 6 4 Mechanical mounting 8 4 1 DIN rail mounting 9 4 2 Chassis mounting 9 5 Electrical connectio...

Page 4: ...N A A Not used 1 2 Conventions The following conventions are used in this document Used in document Description A yellow symbol that illustrates hazard type this symbol is an example for general haza...

Page 5: ...be grounded if possible in order to protect the units and the persons working with them During normal operation the persons working with the units must have no contact to dangerous voltages within th...

Page 6: ...nect wires Wire insulation stripping tool N A Strip wires insulation Press tool for ferrules N A Press ferrules on wires Ferrules recommended N A Terminate wires to connectors recommended different si...

Page 7: ...Package content tools and handling www deifwindpower com Page 7 of 14 Sufficient care must be taken to protect the terminal against electrostatic discharges during the installation Once the unit is in...

Page 8: ...02 Rev C Mechanical mounting www deifwindpower com Page 8 of 14 4 Mechanical mounting 150 154 120 70 141 107 116 78 8 Figure 1 DPS 1 2405 mechanical drawing The DPS 1 can be mounted on a 35 mm DIN rai...

Page 9: ...d and hearing protection Use protection for eyes hand and hearing if the mounting holes for bolts need to be made during installation Drill six 4 mm holes according to Figure 2 on page 9 and the cabin...

Page 10: ...of 14 5 Electrical connections 5 1 Connection diagram The following figure shows the connections to the DPS 1 Protective Earth input 1 2 3 DC OK DC OK 24V DC Out 5 4 6 7 8 DPS 1 Figure 3 Connection di...

Page 11: ...ires to connectors Table 2 Technical data for all connectors D ZFKDS 2 5 Conductor cross section flexible without ferrule 0 2 to 2 5 mm2 Conductor cross section flexible with ferrule without plastic s...

Page 12: ...s the double current or double length will also double the voltage drop Example 1 5 mm2 5 m 5A V 0 6 V Setting 24 0 0 6 24 6 V 6 2 Visual and electrical monitoring DPS 1 has two monitoring types Elect...

Page 13: ...nt Waste electrical and electronic equipment WEEE must therefore be disposed of properly In Europe the disposal of WEEE is governed by the WEEE directive issued by the European Parliament DEIF complie...

Page 14: ...urrent C degrees Celsius Temperature F Fahrenheit 32 5 9 g gram Weight oz ounce 1 g 0 03527 oz Hz hertz Frequency cycles per second kg kilogram Weight lb pound 1 kg 2 205 lb m metre length ft foot or...