
18.04.2018
ASSEMBLY INSTRUCTIONS MLD CONTROL EK-S1
Page 22
10.2
Fault report
DEGERtracker S100-PF-SR
Deliverydate
Serial No..DEGERtracker
Serial No. EK-S1
Serial No. motor
Single system
Energy plant with ……
systems
.
Driven pile foundation Concrete foundation
Measured values according to troubleshooting diagram
YES
NO
East-west axis moves to brightest spot (possibly cover up a solar cell).
East-west drive can move in both directions when controlled by the joystick.
CTC manual control: Moves into horizontal position
Control using wind monitor: Moves into horizontal position
Measured values on Energy Converter S1
AC Voltage Input EK-S1
Terminal L-N
V
DC Voltage EK-S1
Terminal XE1 Pin C,D
V
LED MOTOR POWER OK
D66
LED green
LED off
LED SENSOR POWER OK
D65
LED green
LED off
LED CONTROLLER POWER
D64
LED green
LED off
LED MOTOR 1
DA1
LED green
LEDred
LED MOTOR 2
DB1
LED green
LED red
Voltage Inclinometer
Terminal XC1 and XD1 Pin A,B
V
Voltage CAN-Bus
Terminal XK1 Pin C,D
V
LED Wind and Snow sensor (if connected)
DD1, DG1
LED green
LED redflashing
Please provide latest protocol file from CTC
Contact
Installer Operator
Company/name
Address
Postal code, city
Contact partner > phone number, e-mail address
Delivery address
for return parts:
DEGERenergie GmbH& Co. KG
Service
Industriestr. 70
D-72160 Horba.N.
Germany
Problem description
Spare part needed: