Management Procedure 2585 Rev. F 

4

Note: Please refer to UUC instruction manual for menu navigation instructions, details 
on features and operating instructions (i.e. required amount of couplant and pressure). 

 
3.2.1

 

For bodies with serial number after 700,000; when the unit is powered down, 
simultaneously hold the “+” and middle buttons until the rest symbol appears. All other 
bodies press and hold the “+”. 

 
3.2.2

 

All probes except UTG-P: After reset, select the Main Menu “Cal Settings” function and 
then “Zero”. Follow the on screen prompt to measure the zero plate provided with the 
probe. After zeroing, verify the probe on the thinnest and thickest steps of the 5-step 
block. Allowable tolerances following zeroing are ± 0.05 mm (0.002”). 

 
3.2.3

 

UTG-P probes: Verify the probe face is clean. After reset, select the Main Menu “Cal 
Settings” function and then “Zero”. Hold the probe in air and follow the on screen 
prompt. After zeroing, verify the probe on the thinnest and thickest steps of the 
appropriate 5-step block. Allowable tolerances following zeroing are ± 0.05 mm 
(0.002”). 

 
4

 

Calibration Process

 

 

Note: Whenever the test requirement is not met, verify the results of each test and take 
corrective action before proceeding. 

 
4.1

 

Review the Performance Requirements Table 5-1. 

 
4.2

 

Select the 2-Pt Adjust feature from the Cal Settings section of the menu. Perform a two-
point calibration using the thinnest and thickest of the steps on the appropriate 5-step 
block. This will adjust the sound velocity of the gage and the zero reference to the 
material of the step block. 

 
4.3

 

Using the appropriate Certificate of Calibration template for the UUC, record the 
thickness from the Reference Standard label. 

 
4.4

 

Determine the allowed range of readings using the calculation methods shown in column 
A of table 5-1. 

 
4.5

 

Use the UUC to take measurements on each step of the 5-step block. Verify that the 
readings are within the allowable limits and record the readings on the Certificate of 
Calibration. 

  
 
 
 
 
 
 
 

Summary of Contents for PosiTector Series

Page 1: ...e Requirements 2 Table 1 1 Measurement Ranges 2 2 Measurement Standards and Support Equipment Performance Requirements 2 Table 2 1 UUC Accuracy Requirements and Description 2 Table 2 2 Minimum Use Specification 3 Table 2 3 Actual Equipment Specification 3 Table 2 4 Calibration Environmental and Warm Up Requirements 3 3 Preliminary Operations 3 4 Calibration Process 4 5 Performance Requirements 5 T...

Page 2: ...bration 2 Measurement Standards and Support Equipment Performance Requirements 2 1 The UUC accuracy requirements are based upon the published UUC performance specifications 2 2 Minimum Use Specifications are the minimum test equipment specifications required to meet all the UUC accuracy requirements and the test uncertainty ratio applied 2 3 The uncertainty ratio applied in this Calibration Proced...

Page 3: ...tom 5 Step Block Caution The instructions in this Calibration Procedure relate specifically to the equipment and conditions listed in this section If other equipment is substituted the information and instructions must be interpreted accordingly Table 2 4 Calibration Environmental and Warm Up Requirements Measurement Standards Support Equipment Environmental Requirements Temperature 23 5 C Relativ...

Page 4: ...screen prompt After zeroing verify the probe on the thinnest and thickest steps of the appropriate 5 step block Allowable tolerances following zeroing are 0 05 mm 0 002 4 Calibration Process Note Whenever the test requirement is not met verify the results of each test and take corrective action before proceeding 4 1 Review the Performance Requirements Table 5 1 4 2 Select the 2 Pt Adjust feature f...

Page 5: ...e 5 1 Performance Requirements and Calibration Data for PosiTector UTG Reference Thickness mm Min Reading Allowedn mm Max Reading AllowedY mm Actual Gage Measurement mm A B For imperial metric readings convert using 1 25 4 mm n For UTG P Calculation A 0 010 mm For all other probes Calculation A 0 03 mm Y For UTG P Calculation A 0 010 mm For all other probes Calculation A 0 03 mm ...

Page 6: ... C UTG CA UTG CLF UTG CX UTG M UTG ME UTG P Reason for Change New products Description of Change Updated Table 1 1 Retitled and updated tables 2 1 2 2 2 3 Re wrote section 2 Re wrote Sections 1 1 and 3 2 2 Added section 3 2 3 Updated calculations in table 5 I confirm I have read and understand the procedure and the change described above Printed Name Signature Date Management Form 0010 02 05 1998 ...