TALTERI DIVK-C 60 INSTALLATION
The air exchange unit is meant for warm inner facilities. Suitable installation spots are,
among others, office, dressing or household facilities and technical or warm storages. In case
the temperature of the installation location is lower than room temperature, the factory settings
of the appliance must be changed to obtain faultless functioning. The unit can not be installed
into cold outer premises or garages.
UPPER BASE DUCT
The channelling is usually mounted to the upper base thermal insulation.
The steam barrier puncture must be carefully sealed.
CONDENSATE
Condensate drain is connected to the machine condensate connector (3/8 "external thread).
Condensate can be made at a least 10 mm in the bore copper pipe or Relatively stiff hose.
The water pipe Making about 10 cm in the water trap and the tube is connected
to a floor drain. The water line shouldnt be connected directly to the sewer.
WALL MOUNTING
The wall mounting kit includes a ceiling mounting plate, a wall mounting
plate and 15mm thick insulation pieces. The roof mounting plate is
attached to the machine and the insulation pieces are glued to the rear wall
and bottom of the machine.
The wall mounting plate is installed about 25 mm below the ceiling
surface.The wall mounting plate will be fixed to the wall and then the unit
lifted upto the mounting plate and
the horizontal plane of the machine is
checked.
Ceiling moldings can be put around the machine.
3
170
170
43
200
200
43
20
90
13
0
485
6kpl D=6,5mm
TALTERI
DOOR
120
135
WALL BRACKET
Condensate connector
left (L)
Condensate connector
right (R)