Original Instruction Manual 

 

Personnel Lock System 

 

smart +

 

 

 
 

 

 
 
 

Manufacturer :

 

deconta

 

 GmbH 

 

 

Im Geer 20, 46419 Isselburg, Germany 

 

Designation

 

:

 

Personnell Lock System smart +

 

 

Summary of Contents for smart +

Page 1: ...Original Instruction Manual Personnel Lock System smart Manufacturer deconta GmbH Im Geer 20 46419 Isselburg Germany Designation Personnell Lock System smart...

Page 2: ...very 4 2 2 Transport 4 2 3 Storage 4 3 Delivery Contents 4 4 Technical Description 5 4 1 Article description 5 4 2 Description of the Personnel Lock System 5 5 Technical data 6 6 Initial Operation Ass...

Page 3: ...accordance with the regulations and never use this Personnel Lock System in an inappropriate way In the event of non observance deconta assumes no liability To ensure safe operation of the lock the fo...

Page 4: ...ote 2 2 Transport Care must be taken when transporting the unit in order to avoid damage by improper handling or carelessness 2 3 Storage The shower system shall only be stored in a decontaminated sta...

Page 5: ...ainment area and pose a risk to human health and environment For these reasons containment areas are separated from the asbestos free areas and kept under dynamic negative pressure by means of negativ...

Page 6: ...mm 750 x 750 x 2009 900 x 900 x 2009 1000 x 1000 x 2009 Weight 3 chambers without transport rack appox 130 kg appox 156 kg approx 170 kg Weight 4 chambers without transport rack appox 169 kg approx 2...

Page 7: ...ther and insert the floor grids Note The sewage water connection of the shower chamber should have the shortest path to the water management system in order to avoid unnecessary hose and cable lengths...

Page 8: ...the mounting angles of the floor element and the corner profile The following pictures show the further construction Important To prevent the shower water from leaking make absolutely sure that the do...

Page 9: ...Instruction manual Personnel Lock System smart Version 1 Page 9...

Page 10: ...Instruction manual Personnel Lock System smart Version 1 Page 10...

Page 11: ...Lock System smart Version 1 Page 11 6 3 Automatic shower option For the automatic shower option please be sure to pay attention to the position of the plugs on the roof red circle and the reed contac...

Page 12: ...and Care Daily maintenance Check the water pipes for free flow Clean the personnel lock system area daily Clean the personnel lock system carefully after each end of shift Check the floor elements fo...

Page 13: ...tions apply DIN 8586 bend forming DIN 8588 fragmentation Following national norms directives and specifications apply Overall plan of the machine plant with circuit diagram Detailed and complete dossi...