Instruction Manual
Negative Pressure Unit green dec G 700
Version 3
Page 12
7. Initial operation
7.1. Preparations
Set the measuring point in the contaminated area and connect it to the negative
pressure connection with the PE hose 8 x 1
Determine the measuring point in the clean area (adjoining rooms) and connect to
the atmosphere connection with PE hose 8 x 1
Turn on the main switch
After initialization, the device is ready for operation. The last saved settings are set
automatically.
connection
atmosphere
connection
negative
pressure
main switch