Instruction manual
Waste water filtration unit AS 300 S
Seite 8
7 Initial operation
Attention
The pump may not be operated without water.
Before the initial operation of the waste water pump or after a long period of stagnation,
check that the shaft rotates freely when turned by hand. To this put a screwdriver in the
notch of the shaft end on the fan side and move the shaft. In winter the unit may only be
operated in a frost-protected area.
Fill waste water pump fully through vent connection
Connect waste water hose
Make connection between „Sewage“ and Sewer
Establish power supply 230V
Fill 1/3 of settling tank with water
Switch on unit (Position „MAN“ at selector switch) and check, if water is pumped out
of settling tank
Turn selector switch to „Auto“
The unit is now ready for operation.
Connection
Dirty water
Switch
Manual/Auto