Please note that the electronically controlled Denver e-ribbon Fire™ needs an earthed connection to
the mains in order to work. Therefore, a power socket needs to be present inside the cut-out into which
the fireplace will be fitted.
when installing your Denver e-Ribbon™ fireplace you will need:
• Power drill/Screwdriver
• Drill/bit (suitable for the type of material to which you wish to fix the top and bottom plates of your
fireplace)
• Spirit level
• Tape measure
• Screws (at least Ø 5mm, suitable for the type of wall)
• Wall plugs or expansion bolts (suitable for the type of wall)
The wall cut-out needs to contain a working, earthed power socket to connect the electricity cable of
the Denver e-Ribbon Fire™.
Use non-flammable material inside
the cut-out
min. H 400mm
min. L + 4mm
Fuel T
ank 40 m
m
Fuel Tank Height
+ 20 mm
Fuel Tank Depth + 20 mm
min. D + 2
mm
®
PLASTERBOARD wALLS – STUD-wALLS
The cut-out is made according to the drawing you have received with your fireplace. walls surrounding
the built-in bioethanol fireplace must be constructed of or at least covered with non-flammable ma-
terial like fibre plasterboards (e.g. Fermacell, GypRock FireLine) or bricks. Important: The void above
the fireplace must not be openly connected to the void below the fireplace (create a separation right
above the top of the fireplace)!
STONE/BRICK wALLS
The cut-out is made according to the drawing you have received with your fireplace. The wall itself is
non-flammable which makes it safe to install the bioethanol fireplace directly within the cut-out.
4.1. CREATING A wALL CUT-OUT
Figure 1.3
Example drawing of the wall cut-out and installation