5
3
1B
3
5
4
1A
1D
1C
4
2A
1
2B
2C
3
3
3
1
2
Note Hole Locations
Note Hole Locations
2D
Start at the bottom and
work up with the
supplied roller tool.
Important: Seal must
be fully inserted.
Maximum
Important - See page 4 for the dimensions
16mm
and notes
Install the wall channel.
Install the fixed panel glass. There is a sticker to indicate
which side has the E
ZI
Clean coating. This side must go
on the inside of the shower.
Important: Leave the corner glass protectors on until the
last possible moment.