41
6 STANDARD PROGRAMMING
1 Power Supply
When turned on, “
”, “
” (or the current firmware version) “
”, “
” (or the selected Type) appear on the display in
sequence followed by the closed gate symbol “- - - - ”.
*
If the control panel has already been programmed and the power fails or is switched off - once power is returned and a START command
is given, the position reset procedure is performed (see “rESP” in the table “WORKING STATUS MESSAGES” on page 45.
2 Visualisation of inputs and operations-counter status
1. Scroll the parameters with the and keys until the
screen reads P013;
2. Access the parameter by pressing the button;
3. The “Input Status” is shown on the screen (check that this
is correct):
4. Press the button again;
5. The “Total Operation Counter”
appears on the
screen followed by the
multiplier.
To calculate the number of completed operations, the two
values must be multiplied.
I.e.:
= 120x10 = 1200 operations completed
6. Press the button again;
7. The “Total Maintenance Counter”
appears on the
screen followed by the
multiplier.
To calculate the number of operations remaining before
the maintenance request, the two values must be
multiplied.
I.e.:
= 1500x1 = 1500 operations yet to be
completed before the maintenance request
8. Press the button again to exit the parameters (P013 is
shown on the screen again).
Summary of Contents for NET24N
Page 32: ...30 ...
Page 62: ...60 ...
Page 92: ...90 ...
Page 122: ...120 ...
Page 152: ...150 ...
Page 182: ...180 ...
Page 212: ...210 ...
Page 242: ...240 ...
Page 246: ...244 ...
Page 247: ...245 ...