These instructions describe the installation, operation and maintenance of the subject equipment. Failure to strictly  

follow these instructions can lead to an equipment rupture that may cause significant property damage, severe  

personal injury and even death. If you do not understand these instructions, please call De Nora Water Technologies 

for clarification before commencing any work at +1 215-997-4000 and ask for a Field Service Manager. De Nora Water 

Technologies, Inc. reserves the rights to make engineering refinements that may not be described herein. It is the 

responsibility of the installer to contact De Nora Water Technologies, Inc. for information that cannot be answered specifically 

by these instructions.

Any customer request to alter or reduce the design safeguards incorporated into De Nora Water Technologies 
equipment is conditioned on the customer absolving De Nora Water Technologies from any consequences of such a 
decision.

De Nora Water Technologies has developed the recommended installation, operating and maintenance procedures with 

careful attention to safety. In addition to instruction/operating manuals, all instructions given on labels or attached tags 

should be followed. Regardless of these efforts, it is not possible to eliminate all hazards from the equipment or foresee every 

possible hazard that may occur. It is the responsibility of the installer to ensure that the recommended installation instructions 

are followed. It is the responsibility of the user to ensure that the recommended operating and maintenance instructions are 

followed. De Nora Water Technologies, Inc. cannot be responsible deviations from the recommended instructions that may 

result in a hazardous or unsafe condition.

De Nora Water Technologies, Inc. cannot be responsible for the overall system design of which our equipment may be 

an integral part of or any unauthorized modifications to the equipment made by any party other that De Nora Water 

Technologies, Inc.

De Nora Water Technologies, Inc. takes all reasonable precautions in packaging the equipment to prevent shipping damage. 

Carefully inspect each item and report damages immediately to the shipping agent involved for equipment shipped “F.O.B. 

Colmar” or to De Nora Water Technologies for equipment shipped “F.O.B Jobsite”. Do not install damaged equipment.

De Nora Water Technologies, Colmar Operations 
Colmar, Pennsylvania, USA 
is ISO 9001: 2008 Certified

READ THE ENTIRE MANUAL BEFORE OPERATING

 

USE ONLY IN ACCORDANCE WITH INSTRUCTION MANUAL

    

 

WARNING: HAZARDOUS VOLTAGES

Summary of Contents for Capital Controls CHLORALERT T17CA4000 Series

Page 1: ... 1 325 6030 7 Instruction Manual CHLORALERTTM Series T17CA4000 Chlorine Gas Leak Detector CAPITAL CONTROLS ...

Page 2: ...n labels or attached tags should be followed Regardless of these efforts it is not possible to eliminate all hazards from the equipment or foresee every possible hazard that may occur It is the responsibility of the installer to ensure that the recommended installation instructions are followed It is the responsibility of the user to ensure that the recommended operating and maintenance instructio...

Page 3: ...if damage has occurred report it immediately Do not install any equipment if damage is such that faulty operation is likely to result If plant engineering drawing are available at the installation site locate mount pipe and wire thesubject equipment in accordance with these drawings If plant engineering drawings are not available refer to the Installation section for information concerning these r...

Page 4: ...325 6030 7 4 PAGE INTENTIONALLY LEFT BLANK ...

Page 5: ...1 Electrolyte filling at start up 12 5 2 Electrolyte renewal after operation 12 5 3 Sample flow rate 12 5 4 Gas Test 12 5 5 Circuit performance check 13 6 MAINTENANCE PROCEDURES 14 6 1 Measuring cell maintenance 14 6 2 Flowmeter 14 6 2 1 For Model T17CA4100 14 6 2 1 For Model T17CA4200 14 6 3 Electronic circuit board 14 6 4 Optical sensor Only for Model T17CA4200 14 7 CE DECLARATION 15 FIGURES 1 C...

Page 6: ...by volume The power on alarm lamp commences flashing in the alarm condition In the Model T17CA4100 a relay is also energized to enable external alarms extractor fans etc to be activated The alarm condition is generated in addition to the presence of chlorine in air also by power failures when the power is returned to the system In the Model T17CA4200 a relay is also de energized to enable external...

Page 7: ...y contacts DPDT 10 A 240 Vac resistive load or 28 Vdc Cell response time Instantaneous Warm up time Max 3 minutes Sampling rate 0 05 m3 min Ambient temperature 20 C 4 F to 65 C 149 F Sample inlet connection 1 NPT Weight approx 2 8 kg Mounting Wall Dimensions 215 H x 162 W x 235 D mm Material of construction Housing ABS Cell ABS Electrodes Platinum ...

Page 8: ...325 6030 7 8 Figure 2 Mounting and Outline Dimensions in inches mm CHLORALERT R E S E T A L A R M T S T E WHEN FLASHING C C N R E V E S SERVICES T R N E T ...

Page 9: ... 1 Standard 2 Fail Safe Electrical Requirement 10 120 Vac 60 Hz 20 220 Vac 50 Hz 30 110 Vac 50 Hz Design Level Alarm Level 3 1 ppm Fixed 4 3 ppm Fixed 3 1 Standard accessories 1 kit P N 614S071U0l including 1 electrolyte bottle 1 spare float 1 set of spare O Ring 1 insect screen ...

Page 10: ...ing Securely mount the Chloralert at a convenient working height approx 1 3 1 5 m from the floor 4 3 Sampling line As the Chlorine weight is higher then the air we recommend that the sample inlet point is located at about 200 mm 8 from the floor Use of frigid or flexible 1 PVC tubing is recommended It is recommended to install the proper insect screen supplied at the terminal point of the sample l...

Page 11: ...trical wiring Cable gland on the Chloralert will accept a cable of diameter between 5 to 10 mm Refer to the following drawings to connect the power supply and the external signals to the Chloralert Figure 4 Electrical Wiring ...

Page 12: ...h water and gently clean the electrode faces with a non abrasive chlorine free cleaner Again thoroughly wash cell with water dry with a clean tissue and refill with electrolyte as described under Section 5 1 5 3 Sample flow rate At start up set the sample flow so that the flow indicator sits between the two graduation marks on the flowmeter tube The flow may be adjusted by inserting a broad bladed...

Page 13: ...s checks that the electronic circuits are operating properly If it is desired to check external circuits the RESET switch must be released any remote device connected to the relay will be actuated If it is required that external devices are not actuated during this test release the TEST switch first wait for the LED to assume a steady state this operation may require up to 3 minutes then release t...

Page 14: ...ulated causing malfunction Remove the plastic flow tube retainer by unclipping from the flow tube Using a screwdriver loosen and slide the top tube retainer ring towards the enter of the tube also lift the optical sensor housing towards the center of the tube Remove tube by pulling forward WARNING TAKE CARE NOT TO LOSE THE O RING AND THE FLOATS Clean all parts in mild detergent rinse and wipe dry ...

Page 15: ...is in conformity with the following standards EN 56681 2 Generic emission standard industrial environment EN 56682 2 Generic emission standard industrial environment Following the provisions of directives Electromagnetic compatibility 89 336 CEE modified by directive 92 31 CEE ...