
User Manual
Edge 1-000 series (9INB)
Edge_1000_9INB_UserManual_5DUINQ20_EN_v01-01.docx
Page 37 of 40
Place cup in center
Cup needs to be placed under the correct dispensing nozzle before the start button is
available.
If cup is placed in correct position clean the cup sensor.
Place cup right
Cup needs to be placed under the water dispensing nozzle before the start button is
available.
If cup is placed in correct position clean the cup sensor.
Water filter installed?
Consult the service engineer.
Replace water filter
Consult the service engineer.
Shortcut temp.sensor
Consult the service engineer.
Startup problem
Open/connect the water supply and restart the machine.
If the problem persists consult the service engineer.
Temp. sensor disconnected
Consult the service engineer.
Temp. boiler too high
Consult the service engineer.
Water level too low
Consult the service engineer.
Shortcut temperature sensor
Consult the service engineer.
Temperature sensor disconnected
Consult the service engineer.
Temperature boiler too high
Consult the service engineer.
Wait, Heating boiler
Wait until boiler is heated.
If message is still shown after 5-10 minutes, consult the service engineer.
Water level too low
Consult the service engineer.
Summary of Contents for Edge 1-000 series
Page 1: ...Instant 1 000 User Manual Edge Coffee machine...
Page 40: ......