background image

     

 

  13 / 14 

 

WWW.DDTOP.COM 

any point in the range. (Enter compensation value) The setup process is as follows. 
①  Press and hold the '←' key to enter the configuration mode (the No. 1 menu will be displayed 
first, and the up and down arrows on the left will be lit). 
②  Press the "↑" key to switch the menu to '9' and the LCD shows the current PV compensation 
value. 
③  Press the '←┘' key again, the symbol starts flashing, now press the '↑' key or '↓' to switch to 
the positive or negative sign you want to set. 
④  Press the "←┘" key again to complete the setting, and the highest setting parameter blinks. At 
this  time  press  "↑"  or  "↓"  to  increment  or  decrement  the  current  blinking  digit,  press  "←"  to 
confirm and start the next digit setting, and then set the other digits and decimal points.This menu 
function setting is completed when the left up and down arrows are lit. 

 

Method of calculating the compensation value. 
Compensated value = PV actual - PV pre-output 

 

Note:  The  key  configuration  process  will  not  exit  automatically,  you  need  to  exit  the  key 
configuration manually. The method is to press the '↑' key or '↓' key continuously in the switch 
menu state, the menu will increase or decrease, when the menu is greater than 17 or less than 
1, exit the key configuration state and enter the normal output mode. 

8 Precautions 

8.1  The  temperature  of  the  medium  must  not  exceed  120°C,  otherwise  the  sensor  circuit  will  be 
damaged. 
 
8.2 Confirm that the power supply is safe and reliable and that it is connected in accordance with 
the correct positive and negative polarity. 
 
8.3 The use of UQZ magnetic float level transmitter is not suitable for occasions with high vibration. 
 
8.4 Media viscosity  ≥  10-4 (m2 / s), not suitable for use of UQZ magnetic float level transmitter. 
 
8.5 UQZ magnetic float level transmitter should not work in a strong magnetic field environment. 
 
8.6 Tighten the power cover of the display after debugging to prevent water and moisture in the 
meter. 
 
 
 
 
 
 
 
 
 

Summary of Contents for UQZ

Page 1: ...1 14 WWW DDTOP COM UQZ MAGNETIC FLOAT LEVEL TRANSMITTER Operation Manual UQZ DT JS 1004 2018 A...

Page 2: ...ut prior notice Quality Assurance Dandong Top Electronics Instrument Group Co Ltd guarantees that all glass plate level gauge have no defects in materials and manufacturing processes within one year f...

Page 3: ...sporting 5 2 5 Storage 5 3 Technical Characteristics 5 3 1 Product Features 5 3 2 Main Parameter 5 4 Dimension Schematic 6 5 Unpacking and Inspection 7 5 1 Matters needing attention in unpacking and i...

Page 4: ...ly safe or non flammable site operating procedures 1 2 Process leaks can cause serious injury or death Care should be taken to lift the transmitter If the process seal is damaged the medium may leak a...

Page 5: ...vel 2 3 Packing Please send the packaging waste to a special recycling agency 2 4 Hoisting and Transporting Please select qualified hoisting equipment and lifting straps and pay attention to safety 2...

Page 6: ...Medium temperature 40 120 Accuracy 10mm Power supply inlet M20 1 5 female thread or on request Explosion proof Intrinsic safety type Ex ia C T1 T5 T6 Ga Explosion proof type Ex d C T1 T5 T6 Gb IP rati...

Page 7: ...e appearance of the instrument is defective or damaged 6 Installation 6 1 Installation Tool Wrenches flange gaskets and flange bolts for process connections 6 2 Installation Technical Requirements 6 2...

Page 8: ...ng gasket 6 3 2 UQZ magnetic float level transmitter according to the following diagram to complete the wiring Figure 6 Figure 6 Wiring Diagram 7 Debugging 7 1 UQZ Magnetic Float Level Transmitter Deb...

Page 9: ...e Display 7 1 2 Description of LCD display symbols If you are in HART communication the symbol in the right corner of the LCD screen flashes LCD If the fixed output current is set the LCD will display...

Page 10: ...an switch between positive and negative sign of data 3 If you press the key again the first digit starts blinking when the selection of the symbol is finished it means the symbol bit can be modified T...

Page 11: ...mode the No 1 menu will be displayed first and the up and down arrows on the left will be lit Press the to switch the menu to No 2 and display the current unit symbol in the lower right corner Unit S...

Page 12: ...in 7 1 6 until the setting is complete 7 1 9 Two point Calibration LRV Calibration First adjust the PV value to the zero position the magnetic float toggles to the zero position Switch the menu to 11...

Page 13: ...ion value Compensated value PV actual PV pre output Note The key configuration process will not exit automatically you need to exit the key configuration manually The method is to press the key or key...

Page 14: ...Detect board damage Replace the damaged electronics on the test board No display on LCD screen remote transmission Damaged or poorly contacted ammeter Change the ammeter 10 Disassembly 10 1 Warning A...

Reviews: