background image

     

 

  4 / 9 

 

WWW.DDTOP.COM 

1.

 

Safety Tips 

It is expressly prohibited to modify or change products for safety reasons,repair or replacement 

only allows the use of accessories specified by the manufacturer. 

1.1 Explosion May Result In Death or Serious Injury. 

When installing equipment in an explosive atmosphere, be sure to follow applicable local, national, 

international standards, codes, and procedures. Be sure to install the equipment in Intrinsically safe 

or non-flammable site operating procedures. 

 

1.2 Process Leaks Can Cause Serious Injury or Death. 

Care should be taken to lift the transmitter. If the process seal is damaged, the medium may leak at 

the joint. 

 

1.3 Failure to Follow Safe Installation Guidelines May Result In Death or Serious Injury.   

The operations described in this manual are performed by professionally trained and qualified 

professionals or end-user specialized professionals to complete. 

2.

 

Product Manual 

2.1Main Structure of Product-Figure 1 

 

 

Figure 1 Main Product Structure 

Summary of Contents for UFZ-4A

Page 1: ...1 9 WWW DDTOP COM UFZ BUOY LEVEL GAUGE UFZ Operation Manual UFZ DT JS 1011 2018 A...

Page 2: ...t prior notice Quality Assurance Dandong Top Electronics Instrument Group Co Ltd guarantees that all glass plate level gauge have no defects in materials and manufacturing processes within one year fr...

Page 3: ...2 Operating Principle 5 2 3 Packing 5 2 4 2 4 Transporting 5 2 5 Warehousing 5 3 Technical Characteristics 5 3 1 Main Performance 5 3 2 Main Performance 5 4 Dimensional Schematic Figure 2 6 5 Unpackin...

Page 4: ...sure to install the equipment in Intrinsically safe or non flammable site operating procedures 1 2 Process Leaks Can Cause Serious Injury or Death Care should be taken to lift the transmitter If the...

Page 5: ...e in equilibrium W F G f 0 When the level changes it causes the change of the position of the float The pointer hammer is moved by the wire rope and the corresponding position of the level is displaye...

Page 6: ...d Inspection 5 1 Unpacking Inspection Notice 5 1 1 Check whether the product nameplate Figure 3 is consistent with the supply list information Figure3 Sample Nameplate 5 1 2 Check the quantity of each...

Page 7: ...the fixing bracket of the welding scale should be placed on a vertical line with a deviation of 2 Figure 4 Figure 4 Installation 6 2 2 The bottom guiding mechanism and the buoy are taken into the tan...

Page 8: ...oy are taken into the tank from the inlet hole By observing the perpendicularity of the guide wire at the top it is determined that 2 and the bottom guiding mechanism is welded and fixed to the bottom...

Page 9: ...be paid to hazardous process conditions such as pressure inside the vessel high temperatures corrosive or toxic media etc 8 2 Waste Removal Waste disposal should be carried out in accordance with the...

Reviews: