Preface 

 

Thank you for choosing the products of Dandong Top Electronics Instrument (Group) Co., Ltd. 
 
This  operation  manual  provides  you  with  important  information  on  installation,  connection  and 
commissioning  as  well  as  on  maintenance,  troubleshooting  and  storage.  Please  read  it  carefully 
before installation and commissioning and keep it as part of the product near the meter for easy 
reading. 
 
This manual can be downloaded by entering the version number at 

www.ddtop.com

 

 
If the instructions are not followed, the protection provided by the meter may be destroyed. 
 
Trademark, Copyright and Restriction Instructions 
 
Dandong Top Electronics Instrument (Group) Co.,Ltd.®, Dandong Top Pump Co., Ltd.®, DDTOP® 
are registered trademarks of the company. 
 
The  performance  specifications  of  the  meter  are  effective  as  of  the  date  of  publication  and  are 
subject to change without notice. Dandong Top Electronics Instrument (Group)Co.,Ltd. reserves the 
right to modify the products described in this manual at any time without prior notice. 
 
Quality Assurance 
Dandong  Top  Electronics  Instrument  (Group)  Co.,Ltd.  guarantees  that  all  glass  plate  level  gauge 
have no defects in materials and manufacturing processes within one year from the date of delivery. 
 
During  the  warranty  period,  if  the  product  returns  with  quality  problems  and  the  claim  is 
determined  by  the  manufacturer  to  be  within  the  scope  of  warranty,  Dandong  Top  Electronics 
Instrument (Group) Co.,Ltd. is responsible for repair or replacement of the buyer (or owner) free of 
charge. 
 
Dandong  Top  Electronics  Instrument  (Group)  Co.,Ltd.  is  not  responsible  for  the  costs  caused  by 
improper use of equipment, labor claims, direct or subsequent damage and installation and use of 
equipment. In addition to the special written warranty certificate for certain products of Dandong 
Top Electronics Instrument (Group) Co.,Ltd., Dandong Top Electronics Instrument (Group) Co.,Ltd. 
does not provide any express or implied warranty. 
 
Quality 
Dandong  Top  Electronics  Instrument  (Group)  Co.,Ltd.  has  passed  the  ISO9001  quality  system 
certification. The whole process of product production is strictly in accordance with the scope of the 
quality system, providing the strongest guarantee for product and service quality. 

 

Summary of Contents for UFZ-4A

Page 1: ...1 9 WWW DDTOP COM UFZ BUOY LEVEL GAUGE UFZ Operation Manual UFZ DT JS 1011 2018 A...

Page 2: ...t prior notice Quality Assurance Dandong Top Electronics Instrument Group Co Ltd guarantees that all glass plate level gauge have no defects in materials and manufacturing processes within one year fr...

Page 3: ...2 Operating Principle 5 2 3 Packing 5 2 4 2 4 Transporting 5 2 5 Warehousing 5 3 Technical Characteristics 5 3 1 Main Performance 5 3 2 Main Performance 5 4 Dimensional Schematic Figure 2 6 5 Unpackin...

Page 4: ...sure to install the equipment in Intrinsically safe or non flammable site operating procedures 1 2 Process Leaks Can Cause Serious Injury or Death Care should be taken to lift the transmitter If the...

Page 5: ...e in equilibrium W F G f 0 When the level changes it causes the change of the position of the float The pointer hammer is moved by the wire rope and the corresponding position of the level is displaye...

Page 6: ...d Inspection 5 1 Unpacking Inspection Notice 5 1 1 Check whether the product nameplate Figure 3 is consistent with the supply list information Figure3 Sample Nameplate 5 1 2 Check the quantity of each...

Page 7: ...the fixing bracket of the welding scale should be placed on a vertical line with a deviation of 2 Figure 4 Figure 4 Installation 6 2 2 The bottom guiding mechanism and the buoy are taken into the tan...

Page 8: ...oy are taken into the tank from the inlet hole By observing the perpendicularity of the guide wire at the top it is determined that 2 and the bottom guiding mechanism is welded and fixed to the bottom...

Page 9: ...be paid to hazardous process conditions such as pressure inside the vessel high temperatures corrosive or toxic media etc 8 2 Waste Removal Waste disposal should be carried out in accordance with the...