DDB AIR CONDITIONER SYSTEMS Operation And Installation Manual Download Page 11

 

 

 

11

 
After all debris has been removed from the system, replace the cover onto the unit being 
careful not to pinch or damage the wiring connecting the cover to the base. 

 

Another part of the system which may need cleaned occasionally is the cooling system 
cabinet.  To clean the system cabinet, simply wipe it with a damp, lint free cloth.  A mild 
soap solution may be used if necessary. 
 

 

 

Trouble Shooting 

 

 

If your air conditioning system should fail to operate satisfactorily during the first 

year of operation, do not remove the cover without first notifying the factory.  Removal of 
the cover will immediately void your warranty.  If an operating problem should occur, 
please make the following simple checks before contacting DDB.

 

 

 

Is

 electrical power available at the outlet? 

 

* Is the power cord plugged into the outlet? 

 

* Is the controller set point temperature above the enclosure temperature?  

 

* Is the evaporator (cold air stream) blower operating? 

 

* Is the compressor and condenser (warm air stream) blower operating? 

 

* Is the enclosure door closed tightly? 

 

* Are all gaskets in place? 

   

 

* Are there any unusual ambient conditions? 

 

* Has the warm air filter been cleaned or changed recently? 

 

* Is the system mounted level on the enclosure?

 

 

* Is there adequate space within the enclosure for air flow? 

 

* Is there adequate space around the enclosure for air flow? 
* Have you recently added electronic equipment to the enclosure? 

 

 

If you are still experiencing operating difficulties after making these checks, please 
contact DDB at 800-753-8459. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Summary of Contents for AIR CONDITIONER SYSTEMS

Page 1: ...1 AIR CONDITIONER SYSTEMS FOR ELECTRONIC ENCLOSURES OPERATIONS AND INSTALLATION MANUAL ...

Page 2: ...uture reference Some information may not apply to your system Where To Find Information On Introduction Page 3 Basic Operation Page 4 Unpacking Inspection Page 4 Pre installation Test Page 5 Preparing The Enclosure Page 6 Operating Your System Page 7 Programming The Controller Page 8 Alarm Operation Page 9 Maintenance Page 10 Troubleshooting Page 11 Schematic Wiring Diagram Page 12 Warranty Back P...

Page 3: ...etically pleasing package requiring minimal maintenance The closed loop circulation design also protects your equipment from air borne dust and contaminants which may hinder your equipment operations and cause unnecessary downtime DDB offers models ranging in cooling capacity from 1 000 to 20 000 BTU per hour to provide cooling systems for many of your conditioning needs DDB also offers select mod...

Page 4: ... enclosure through a filter and across the warm air heat exchanger Here heat from the enclosure is transferred from the warm air heat exchanger to the warm air stream and dissipated to the ambient Unpacking Inspection What to look for 1 Shipping container is banded to the pallet and arrows on the shipping container are pointing in the proper upward direction The system is position sensitive DDB re...

Page 5: ...ended If any unusual noise or vibration is present during the testing procedure immediately disconnect the power cord and inspect the unit for the cause of the noise or vibration and contact Ice Qube immediately 4 As soon as power is supplied to the system the cold air evaporator blower will begin operation The compressor and warm air condenser blower will not operate if the room air temperature i...

Page 6: ...e the modifications to be made to the enclosure using a marking pencil Note the boltholes cutouts for the inlet and outlet air streams and the power cord 4 Make the holes for the studs bolts and power cord using a drill Bit size will vary with model Be sure to protect any equipment located within the enclosure from debris produced during the installation procedure 5 Drill a pilot hole for a saber ...

Page 7: ...air blower start This signifies that the cooling system has begun operation to remove heat and humidity from within the enclosure It may take 20 to 30 minutes operating time to reach full capacity If the heat load within the enclosure is less than the BTUH capacity of the of your Ice Qube system you will notice the temperature on the digital display begin to decrease When the temperature inside th...

Page 8: ...rm settings Press the Select 3 button to continue The set alarm hi LED is on with the display indicating the high temperature alarm set point The alarm will activate at this temperature and will automatically reset at 2 degrees Fahrenheit 1 degree Celsius below this temperature Press the Adjust up 1 or Adjust down 2 arrow to change the alarm set point in a range from 8 degrees Fahrenheit 4 degrees...

Page 9: ...re installed on your system no filter is supplied with your system and the filter alarm should be set to 0 This will disable the filter alarm Press the Select 3 button to continue Making adjustments to this setting is necessary only for installation of the ICENET communication network Omit this otherwise The program LED will be lit and the display will show Add This is where you will program the n...

Page 10: ...order to prevent prolonged cooling system downtime The dirty filter may be cleaned at a more convenient time 2 Condensate Management System The condensate management system should be checked periodically for scale sludge and debris which may cause the system to fail On open type enclosures and in areas where the enclosure door is opened frequently in dirty or industrial environments maintenance sh...

Page 11: ...ould occur please make the following simple checks before contacting DDB Is electrical power available at the outlet Is the power cord plugged into the outlet Is the controller set point temperature above the enclosure temperature Is the evaporator cold air stream blower operating Is the compressor and condenser warm air stream blower operating Is the enclosure door closed tightly Are all gaskets ...

Page 12: ...tify the seller of such defects whether patent or latent within the Warranty Period Seller shall have no further liability or obligation to the Buyer Therefore in no event shall Seller s liability under this warranty exceed the original purchase price of the products which are the subject of a proper notice of defects Excluded from this transaction are all implied warranties including without limi...

Reviews: