![DCS 221712 Installation Manual Download Page 13](http://html1.mh-extra.com/html/dcs/221712/221712_installation-manual_517403013.webp)
11
INSTALLATION
9.
Ducting: There should be no more than 1"
gap between canopy transition and house
ducting. Adjust starting collar over both
ducts. Tighten collar. Fasten duct with
screws and tape per code. Screws must not
hamper the damper. See Fig. 9.
INTEGRAL VENTILATOR INSTALLATION
(see Fig. 10 to 11)
1.
The Integral ventilator can be mounted to
discharge air towards the ceiling. So motor
connector may be located frontwards.
From the inside of the hood, slip motor into
the bracket on the left.
Rotate motor upwards until it snaps into the
spring clip on the right.
Secure the motor to the hood with the
machine screw and lock washer.
Plug connector into the motor, Fig. 11.
FIG. 10
Spring Clip
Outlet
Bracket
Motor Connector
Spring Clip
Motor
support
Fixing
point
Fixing
point
Bracket
Integral ventilator for 40" Hood
10" Duct
Collar
Transition
S
From Control
Panel
Motor connector
FIG. 9
FIG. 11
Summary of Contents for 221712
Page 1: ...THE PROFESSIONAL ISLAND VENT HOOD Installation Guide MODELS IVS40 IVS52 RDS 364GD...
Page 2: ......
Page 22: ...NOTES 20...
Page 44: ...REMARQUE 21...
Page 45: ...REMARQUE 22...
Page 46: ...REMARQUE 23...
Page 47: ......