Sanitizing tunnel
ESV700
www.dcm.com.ar
Installation Manual
Page.: 8of23
4 Installation
4.1 Required tools
Industrial hammer drill
10mm Widia Solid Carbide Drillfor concrete
4 10mm expansion metal plugs (type FISCHER steel MR10).
14 and 17mmwrench.
Mm Hexkey set.
Please carefully read all sections before starting the installation.
4.2 Preliminary work on site
Verify the position and location of the equipment according to the general
installation.
Depending on the area of installation of the equipment, there are two posible
variants.
1. If the floor is concrete, the installation can be carried out, with the help of
steel or chemical drills, by placing the drills in a position that matches
with the anchoring holes of the cabinet, either by means of the
installation plane or with a template.
2. In all the cases where the floor is not concrete, the installation should be
done on a bulk head plate. It must be made with threaded rods ØM10,
according to the installation blueprint, and tacked to the existing ground
with cement. It has to be 10cm below the level of the floor. It must also
be taken into account in this instance, that the threaded rods that are part
of the plate exceed the level of the floor by 5 cm.
Check that the floor or concrete base where the cabinets will be mounted is
even and l/- 5mm in the area of attachment of the cabinets.