Step 4.
,QVHUW8EROWWKURXJKHDFKFRUQHURIWKHEDVHSODWH%DVHSODWHPXVWOLHÀDWRQWKHEDVHZHLJKWV6HH)LJXUH
Step 5.
tac t o a
itional ei ht on each a e ei ht ith the U
olt rotr
in thro
h the matchin hole in
each ei ht ee
Fi
re
Figure - Insert U-Bolts T roug Base Plate
Figure 1 - Stac T o eig ts on eac Base eig t
Step 6.
Po ition the oo To nchor on the U
olt an ei ht at a
e ree an le to the a e late that a
re io
l in talle a e
re each U
olt a
e thro
h one o the mo ntin hole in the oo To nchor
a e late ee
Fi
re
Step 7.
an a
itional la er o ei ht total o i teen ei ht are
e in the oo To o nter ei ht nchor
tem ach o the o r ei ht tac
ill contain o r ei ht
a e ei ht l
three a
itional ei ht in
each tac
ee
Fi
re
Figure 11 - Place Roo Top Anc or on U-Bolts
Figure 12 - Final La er o eig ts
Step .
Po ition each o the o r i tin it lin rac et at the en o the i tin it lin tra
o er the U
olt a
VKRZQLQ)LJXUH(DFKEUDFNHWÀDQJHPXVWEHSRVLWLRQHGRYHUWKHHGJHRIWKHZHLJKWEHORZLW,QVWDOOD
a her an a n t on each o the U
olt en
Ti hten all ei ht n t to
t l
Step .
oo a connector rate or a li tin
o
l
or reater thro
h the to o the tra a
em l
here the o r i tin it tra
are oine n ert the connector ia onall o that t o tra
are on each
i e o the connector
ee Fi
re
The oo To o nter ei ht nchor
tem i no rea
or tran
ort
e o the i tin it ee Fi
re or an e am le o i tin it connection to a hoi t
tem ith a e
ate
li tin ca acit U e ca tion hen tran
ortin the
tem
Figure 13 - Place Li ting Kit Brac ets on U-Bolts
Figure 14 - Rea
to Transport