7
OPERATING YOUR FOLD DOWN CLOTHESLINE
TO RAISE
Grip the center of the Front Bar with one or two hands
as shown below. Gently raise the bar to the maximum
point of travel, push inwards with even force until it
hits a hard stop and then release.
The clothesline will be locked into the upright position.
TO LOWER
Grip the centre of the Front Bar and gently lift the
clothesline upwards to the maximum point of travel.
Pull outwards to unlock the bracket and lower.
Note:
Raising the frame without gripping the
center may result in only one arm locking
correctly. If this occurs, raise the affected arm
to max height and press inwards until it hits a
hard stop and release.
IMPORTANT!
Maximum recommended loading of this clothesline is 1kg per meter of line.
Refer to your individual clothesline for specified line space.
1
2
2
1
3
LIFT
LOWER
LIFT
PULL
PUSH