![DAYLIFF Poolchlo30 Installation & Operating Manual Download Page 12](http://html1.mh-extra.com/html/dayliff/poolchlo30/poolchlo30_installation-and-operating-manual_515536012.webp)
Wiring to Power Source:
The Control Unit comes with an un-terminated Power Cord (AC Input) which is
typically connected to an external timer, which will turn the pump and Control
Unit on and off together. Have the Control Unit wired to the load side of the timer
by a qualified person. See the figure 5 for typical wiring.
9
At this point, equipment installation is complete. If the water has not yet been
prepared then salt should be added to balance water chemistry. Turn the Control
Unit to the Power Off mode until enough salt has been added to the water.
VOLTAGE CONVERSION:
Always double-check the voltage of the power source. Connection to improper
voltage can: a) cause severe damage/harm, or b) cause lights and screen to
power on without system function.
All service should only be done by a person with appropriate electrical skills, with
all equipment disconnected from power.
The unit is shipped from the factory with a 240V
configuration.
NOTE
When used with variable-speed or other electronically controlled pumps, the
Control Unit can be connected directly to the power source. This will allow the
pump to determine when the Cell is energized or dormant by activation of the
Flow Switch.
Fig 5