background image

7

DSR Premium Edition / Plus 

Technical Specifications

DSR LCD  / Plus

Technical Specifications

www.daygas.eu

DSR Premium

Model

Capacity

Gas 

Consumption

Dimensions

(mm)

Weight

(kg)

Heating Area

(m²)

Installation

Height

Ceramic

Plate

kW

m³/h

NG

m³/h

LPG

H

L

W

Net

Gross Min Avg Max

CM

Pcs

DSR 6 

Premium

6

0,57

0,42

270

780

225 13,35 14,75

9

15

20

180-300

4

DSR 10 

Premium

9

0,86

0,63

270

960 225 15,50

17,15

12

20

30

185-300

6

DSR 12 

Premium

12

1,14

0,84

270

960 225 15,50

17,15

18

25

40

190-350

6

DSR 18

Premium

18

1,71

1,27

270 1505 225 30,55 33,01

25

30

50

200-450

12

DSR 25 

Premium

25

2,38

1,76

270 1505 225 30,55 33,01

30

35

55

205-450

12

Elektrical Connection:

230-240VAC 50-60Hz +/-%15

Working Pressure:

 NG 21-55 mbar LPG 32-55 mbar

Electricity Consumption:

 10,3 w/h

Gas Connection:

 

G3/4’’

Stage:

 

2 / 5

DSR LCD 

Model

Capacity

Gas 

Consumption

Dimensions

(mm)

Weight

(kg)

Heating Area

(m²)

Installation

Height

Ceramic

Plate

kW

m³/h

NG

m³/h

LPG

H

L

W

Net

Gross

Min

Avg

Max

CM

Pcs

DSR 6 LCD 

6

0,57 0,42 270 780 225 16,40

17,08

7,65

12,75

20

180-300

4

DSR 10 LCD

9

0,86 0,63 270 960 225 18,80 20,45 11,08

17

25,05

185-350

6

DSR 12 LCD

12

1,14

0,84 270 960 225 18,80 20,45 15,03 21,25

34

190-350

6

DSR 18 LCD

18

1,71

1,27 270 1505 225 38,05 40,06 21,25 25,05 42,05

210-450

12

DSR 25 LCD

25

2,38

1,76 270 1505 225 38,05 40,06 25,05

30

46,05

200-450

12

Elektrical Connection:

230-240VAC 50-60Hz +/-%15

Working Pressure:

 NG 21-55 mbar LPG 32-55 mbar

Electricity Consumption:

 10,3 w/h

Gas Connection:

 

G3/4’’

Stage:

 

2 / 5

Summary of Contents for DSR Series

Page 1: ...S GAS OPERATED RADIANT HEATERS USER AND INSTALLATION MANUAL MANUFACTURER Daygas Heating Systems n Tah Ltd Sti Firuzk y Bulvar No 206 34325 Avcilar Istanbul 0 850 532 91 53 0 212 423 30 44 Avcilar VD 2...

Page 2: ...Areas 15 Gas Valve Adjustment Procedure DSR Series Parts Ignition Electrode DSR LCD Premium Assembly Steps Step 1 11 12 13 DSR Industrial Gas and Electric Connection 19 www daygas eu Step 2 14 Require...

Page 3: ...on sale and aftersales activities of ceramic fillet heaters industrial ceramic fillet heaters hot air generators pipetype fillet heaters and electric infrared heaters OUR VISION Energy savings with th...

Page 4: ...l places zones and sites Buildings structures and soil in the process of construction of buildings and structures For technological heating of materials and equipment DSR Series Usage Areas Cafes and...

Page 5: ...gas distribution companies in the usage area It should be used by making the necessary settings The device should never be operated without providing the necessary settings In the region where the de...

Page 6: ...he manual consisting of a gas valve an ignition a boiler and a card with spe cial software The specifications of the supplied products will be specified in a separate annex in this manual The technica...

Page 7: ...rical Connection 230 240VAC 50 60Hz 15 Working Pressure NG 21 55 mbar LPG 32 55 mbar Electricity Consumption 10 3 w h Gas Connection G3 4 Stage 2 5 DSR LCD Model Capacity Gas Consumption Dimensions mm...

Page 8: ...3 400 4 230 1 Normal closed 50 0 7 15 60 G3 4 1 115 x 65 x 93 Ignition Electrode Technical Specifications PARAMETER VALUE Power source V Current frequency Hz Consumed electrical power Excluding the p...

Page 9: ...g pipes with a flex in the burner body Ceramic tiles are compressed to the body of the boiler with wicks and fixed in such a way that there is no gap between each other Reflective reflectors are place...

Page 10: ...lock should be done by Daygas Authorized Service Before connecting the valve block to the gas pipeline the gas pipeline must be cleaned and must be degassed Gas valve and natural gas line connection m...

Page 11: ...se with the wrench by turning it counterclockwise is reduced By slowly turning the screw of the adjustment pressure regulator to the right and left the burner nozzle Make sure that the gas pressure at...

Page 12: ...attached to the other A ground electrode is welded to the plate between the insulators The fastening of a high voltage wire to the spark plug is carried out with a nut flame sensor A wire with a plug...

Page 13: ...d The gap between the device and the ceiling must be at least 50 cm The gap from the base to the device is at least 180 cm The space from the floor to the device may vary according to the rates approv...

Page 14: ...ions Fix the C pin bearings with the number 3 fixing pins in order to connect the device extension and fixing feet with the device Move the device in the direction of the arrow to the desired angle an...

Page 15: ...DSR LCD DSR Premium Gas and Electric Connection Electrical Connection Socket 190 260 V 50 60 Hz Gas Connection 3 4 Gas Pressure 20 50 mbar 15 www daygas eu...

Page 16: ...DSR INDUSTRIAL SERIES 16 www daygas eu...

Page 17: ...DSR 30E 30 2 85 2 11 515 1440 410 31 80 36 60 40 50 70 250 500 12 DSR 35 36E 35 35 5 3 37 2 50 515 1440 410 31 80 36 60 45 55 75 270 550 12 DSR 38E 38 38 5 3 61 2 67 710 1440 410 51 85 58 03 55 65 90...

Page 18: ...sed in the wall hanger Make sure that 8 pieces are installed Make sure that the gap between the device and the ceiling is 1 5 m The gap from the floor to the device is 2 5 m The space from the ceiling...

Page 19: ...DSR Industrial Gas and Electric Connection 1 2 1 Electrical connection socket 190 260 V 50 60 Hz 2 Gas connection 3 4 Gas pressure 20 50 mbar 19 www daygas eu...

Page 20: ...on who commissioned the ceramic radiant heater Read this guide The person who commissions the heaters must have the knowledge of Safety Rules for Gas Distribution and Gas Consumption Networks and have...

Page 21: ...restart the emitter should be disconnected from the power supply and the valve in the gas pipeline upstream of the emitter should be closed After that it is necessary to find and eliminate the fault a...

Page 22: ...of the mixing tube Evacuate to run until there is no dust exit from the heater The frequency of cleaning the interior depends on the degree of dust in the room Check all electrical connections check...

Page 23: ...s prohibited Gas and Electricity Connection Considerations Gas Connection The gas connection of the device has been authorized by the distribution company and must be done by certified persons The gas...

Page 24: ...nformation screen on the device does not turn on Check the electrical connection of your device My device ignites but does not catch fire Check the gas connection of your device My device does not swi...

Page 25: ...contact with the device Check the gas connection of your device against gas leakage Do not interfere with your device with bare hands Make sure that the flammable part of your device is flammable and...

Page 26: ...WARRANTY CERTIFICATE 26...

Page 27: ...sumer may request the return of the goods a reduction in the price at the rate of defects or if possible the replacement of the goods with a non defective one from the seller The seller cannot refuse...

Page 28: ...ase the device s are first started up outside of Daygas Heating Systems or Daygas authorized service 6 In case of malfunctions and damages arising from electrical voltage fluctuations that will occur...

Page 29: ...29...

Page 30: ...nd Model Serial Number Authorized Service Title Address Phone Number Fax E Mail Authorized Stamp Yetkili Signature Seller Company MANUFACTURER 30 Title Address Phone Number Fax E Mail Authorized Stamp...

Page 31: ...sioning Date Of The Product MANUFACTURER Daygas Heating Systems n Tah Ltd Sti Firuzk y Bulvar No 206 34325 Avcilar Istanbul 90 850 532 91 53 90 212 423 30 44 Avcilar VD 2710796836 Title Address Phone...

Page 32: ...325 Avc lar stanbul 90 850 532 91 53 90 212 423 30 44 info daygas eu www daygas eu MANUFACTURER Daygas Heating Systems n Tah Ltd Sti Firuzk y Bulvar No 206 34325 Avcilar Istanbul 0 850 532 91 53 0 212...

Reviews: