CONTENTS
1.0 EC Declaration of Conformity
2.0
Introduction
Figure 1 – Basic Technical Specifications
2.1
Basic Safety Points
2.1.1
Who is responsible?
2.1.2
Working conditions
2.1.3
Working near underground obstacles
2.1.4
The Danger Area
2.1.5
Transporting the Vibrator
2.1.6
Transporting piles on site
3.0
How does the EMV300 work?
4.0
Mounting Instructions
4.1
Mounting the Vibrator
4.2
Hydraulic hoses - layout and connections
5.0
Operating Instructions
5.1
Preparations – before driving/extracting piles
5.2
Driving piles
5.3
Extracting Piles
6.0
Maintenance
6.1
Daily Maintenance
6.2
Every 50 working hours
6.3
Every 1000 working hours
7.0
Trouble Shooting
7.1
EMV clamp does not close
7.2
EMV clamp closes but the unit will not vibrate
7.3
Unit will not run at the correct speed – “jumps around” or speed fluctuates
7.4
Oil blowing out of the motor blow-off valve
7.5
Oil blowing out of the gearbox breather valve & the box is full of oil
7.6
Clamp closes itself immediately after being opened
7.7
Clamp looses grip on the pile
8.0
Hydraulic Metric Hose and Fitting List – for the EMV300
9.0
Parts Lists for the EMV300,
Summary of Contents for EMV-300
Page 5: ...Figure 1 Basic Technical Specifications...
Page 28: ...DAWSON CONSTRUCTION PLANT LIMITED 9 0 PARTS LISTS FOR THE EMV300...
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 40: ......
Page 45: ...STAND Remarks Inspect general condition of stand...