
Setting the DavisTalk Transmitter ID
Page 9
4.
Check the Junction Board cable connections: SIM Sensor, SIM Power (SIM),
Motor, Temp/Hum Sensor, and Solar Panel (SOL).
5.
Install the Junction Board Cover as show below. The Junction Board Cover
presses easily into place when you are installing it. To remove the cover,
press gently in on both sides to release the latches holding it in place.
6.
Slide the two sections of the Radiation Shield completely together.
7.
Place the flat washers, lock washers and plastic wing nuts over the
threaded rods.
8.
Finger-tighten the wing nuts until they hold the radiation shield plates
firmly in place.
S
I
M
Sensor
Interface
Cable
SIM
Power
Cable
Solar
Panel
Cable
S
O
L
Junction Board Cable Connections
Junction Board Cover
Junction Board
Press in on Sides
near latches
to Remove Cover
Junction Board Cover Installation