background image

4  

 

© 2020 Davis Packaging : DPM39-0320ARef 

        Setup and Film Loading

 

1. Position unit on a flat level surface. Adjust feet (A) as needed to eliminate rocking. 
2. Place film roll on top of Film Rollers (B) so that the Film Unwind (C) is coming from 

bottom of roll towards front of unit and over Film Retaining Rod (D), and slightly past 

Guard Lever (E). 

3. Plug unit into 110 v - 120 v power source and flip Power Switch (F) on to heat Cutting 

Rod (G) (approx. 3-5 mins).  Rod is fully heated when film easily cuts.  

4. Grasp sides of film from behind Film Retainer Rod (D) and simultaneously pull 

forward and press down on Guard Lever (E) to cut excess film and create a clean 

start line. 

5. Adjust Film Tension Screw (H) until a slight drag is felt when pulling film to prevent 

film roll from over spinning and sticking to itself.  Loosen Film Tension Screw if film is 

difficult to pull or rips when pulling. 

6. Plug Optional Accessory Hand Iron or Hot Plate into Accessory Outlet or extension 

cord.  Turn on accessory and allow to heat (3-5 mins). Adjust thermostat knob until 

Iron or Hot Plate is hot enough to seal film seams without melting holes in film.  Turn 

knob clockwise to increase heat and counter-clockwise to lower heat. 

P: 800.622.3015 / 561-290-0412  □  E-mail: [email protected] 

www.davispackaging.net 

 

(E) Guard Lever 

(D) Film Retainer Rod 

(B) Film Rollers 

(C) Film Unwind Direction 

(H) Tension Screw 

(A) Adjustable Feet x 6 

(F) Power Switch 

(G) Cutting Rod 

Summary of Contents for M39

Page 1: ...watts Accessory Outlet 15amp 43 86 W x 12 1 D x 7 96 H 25 lbs HP912 Hot Plate optional Seals wrapped bundle Adjustable thermostat Replaceable Teflon cover 9 x 12 seal area 5 ft power cord 115v 6 5 amp...

Page 2: ...ng Rod Film Rollers Adjustable Feet x 6 Guard Lever Anti Burn Guard Film Retainer Rod Accessory Outlet 15A 125v Accessory Fuse 15A Hot Rod Fuse 2A Power Switch Film Roll D Ring Film Stop x 2 Electrica...

Page 3: ...ST Hand Iron www davispackaging net Seal Option Part Reference P 800 622 3015 561 290 0412 E mail contact davispackaging net Thermostat Dial Power Switch Heat Element Fuse 6 25A Power Cord Thermostat...

Page 4: ...t excess film and create a clean start line 5 Adjust Film Tension Screw H until a slight drag is felt when pulling film to prevent film roll from over spinning and sticking to itself Loosen Film Tensi...

Page 5: ...o work area Do not cut film from roll 2 Place bundle face down on top of film For cleanest finished appearance Face up if not a concern 3 Bring front edge of film up and over the bundle to the back ed...

Page 6: ...te hands to finish left side of bundle Seal Option 1 Hot Plate Flip bundle over and place folded seams on hot plate until fully sealed Adjust thermostat knob so bundle can sit without melting holes in...

Page 7: ...r Switch Hot Rod Fuse 2A Accessory Outlet Power Cord Service Panel Panel Retaining Screws x Electrical Service Panel Caution Unplug unit before removing Service Panel to avoid electrical shock Electri...

Page 8: ...er does not show continuity replace 2 Amp fuse 2 Test the Cutting Rod Neon Circuit Tester Remove Electrical Service Panel With the power OFF disconnect red wire from Circuit Board Terminal 1 and secur...

Page 9: ...ay test Electrical Outlet Wiring and Terminal Block Check Outlet Connections Remove Electrical Service Panel With power OFF visually inspect all wiring from Terminal Block to Fuse to Outlet to ensure...

Page 10: ...Cutting Rod After rod has fully cooled blow or brush film debris from unit Deep Cleaning Cutting Rod of Burnt Film TURN OFF UNPLUG THE UNIT AND LETTHE MACHINE COOLDOWN BEFORE CLEANING Cover the unit...

Page 11: ...net Replacement Parts 1818 001 Circuit Control Board 1821 013 Fuse Holder 1824 020 Hot Rod Cut Off 43 25 Inches Long CR4325 1872 009 Lighted Rocker Switch 1875 055 Wiring Terminal Block 1845 011 Acces...

Page 12: ...ge A Return Authorization RA number and shipping address will be provided in order for the failed part to be returned for evaluation Return shipping costs must be prepaid and shipped within 30 days of...

Reviews: