9
3.2.2 Mounting of the Probe clamp
Fig. 5
Fig. 6
O-ring
nut
Next
E
Pierce the top wall of the pipe
work through the clamp:
- Ø 14 mm for the electrode/pH
probe.
Choose a mounting location on your
pipework that is:
1. Prior to your salt cell
2. BEFORE the placement of the
acid injection point
3. Ensure the probe clamp lead
is within reach of the pH pump
controller
Fig. 8
Probe nut
Disk brake
Washer seat
O-ring
Bracket
3.2.3 Mounting of the pH Probe into the Probe Holder
After removing the protective cap from the probe, you need to ensure
all the parts are as shown in the Fig.7.
Once the probe has been constructed as indicated in Fig.7, tighten
the probe nut without crimping the probe body. Push the probe
approximately 20mm into the pipe work so that the probe tip is
approximately halfway into the pipe work. Connect the probe lead to
the BNC terminal on the pump. (Fig.8)
Fig. 7
Summary of Contents for M5138
Page 19: ......