4
Chapter 1 Packing
Discharge the outside packing and other packing material, to check whether any damage or
missing during transportation according to “packing list”. If find damage or missing, should
notice the carrier immediately.
PACKING
Standard scheme:
main post and its components, sub post and its components
(
1
#)
,
hydraulic
unit
(
2
#)
,
standard equipment’s totally 2 cases.
Chapter 2 Description of machine
2.1 USAGE
This two post lift can lift various vehicles which weight is less than 4500kg. And it is
suitable for vehicle test, repair, maintenance and care.
This lift is designed to lift vehicles, not for other usage.
-Forbid to use for washing and spraying vehicles!
-Forbid to lift vehicle which weight is over 4000KG!
2.2 FEATURES
-Design and manufacture according to relevant standard, and machine performs stable and reliable.
-With hydraulic locking and mechanical locking system, safety and reliable.
-With insurance bar for top protection, to prevent effectively the vehicle from being damaged.
-With safety valve and antiknock valve in case of hydraulic failure or over loading, to prevent the lift from
lowering quickly when oil pipe bursts.
-Double cylinder drive, to lift and lower stably.
-Adopt imported hydraulic and electrical components from Italy, Germany and Japan.
2.3 MAIN FABRIC PRINCIPLE:
-Lifting fabric: Each post has one cylinder, when pump the oil into the cylinder, the cylinder pole will move
upwards, to hold the carriage move upwards.
-Support fabric: After driving the vehicle into the working area, adjust the angle of arms and length of extension
arms, to ensure the arms support on the effective vehicle bearing point.
Fix the position of vehicle by arm orientation fabric, in case of slipping.
Then adjust the screw to fit different height chassis.
-Balance fabric: To keep the balance during lifting, connect the two carriages with two steel cables to ensure the
synchronization of the two. Then tighten the steel cable, or it will not synchronize.
If carriages, arms are not in level, adjust the steel cable nut, to ensure the carriages and arms in level. Then
tighten the cables to ensure the synchronization.
-Electromagnetic safety locking fabric: During lifting, each post has safety-locking device to ensure the lift can
stop reliable without falling.
-Principal of electromagnetic safety locking: The upper side of safety racks adhibit on the safety teeth for the
angle and deadweight. The carriages push the safety rack and go up step by step. If failure of lift and begins to
lower quickly, safety rack will clip on the teeth to stop the carriage to stop lowering.
(See picture 9 and 10)
Summary of Contents for LJCC2045A
Page 1: ...1 TWO POST LIFT LJCC2045A U Us se er r s s m ma an nu ua al l Manufacturer ...
Page 6: ...6 Chapter 2 Description of machine Picture 2 arm extension drawing ...
Page 15: ...15 7 2 EXPLODED DRAWING OF MAICHINE ...
Page 16: ...16 Circuit diagram 220V ...
Page 17: ...17 Circuit diagram 380V ...