4.1 PREPARATION BEFORE ADJUSTMENT 

-Upright adjustment: 
Use plumb to fix the top of post and check whether its install position is upright. 
Then hammer the expanded bolt and tighten the ground bolt cap. 

Only  can  hammer  the  expanded  bolt  after  the  expired  period  of  the  concrete  and  the  gap 
between  base  plate  and  ground  surface  must  be  filled  with  iron  plate  or  concrete  and  then 
tighten the anchor bolts.! 
 
4.2 PROCESS OF ADJUSTMENT 

-Check whether the connection of power is correct, pay attention to the turning of 3 phase motor.   

-

Ensure all bolts are tightened enough. 

 

-Press “UP” button, safety board goes up with carriage and releases the lock. Release the button, 
carriages stop lifting.

 

-Press  “DOWN”  button,  to  pull-in  electromagnetic  steel,  and  the  carriages  lower.  Release  the 
button, carriages stop lowering.   

 
4.3 SYCHRONIZATION ADJUSTMENT 

-Repeat to lift and lower the lift several times, to ensure the tensile force of two steel cables. If not, 
adjust the cable nut. 
-Press “UP” button, to check whether the lifting and lowering of carriage is synchronized. If not, 
adjust the cable nut.

   

   

4.4 LOADING TEST 

To check whether hydraulic system works normally when loading heavy weight.

 

Notice: 

-Check every oil pipe and fitting, to ensure no leakage before operating the lift.   

-Use all the arms when lifting vehicle on the recommended point of the chassis.

 

Vehicles barycenter must be 

in the middle of two support arm.

 

-Remove or install any heavy part, one should use safety support like jack to keep the balance of vehicle. 

-When lifting or lowering with loading, forbid personnel to stand under the arms or vehicle and keep in case of 

danger. 

-Cut off all the power when lift is not on work.

 

 

 

Chapter 5 Maintenance and care 

Notice 
ATTENTION: 

-All bearings and hinges on this machine must be lubricated once a month 
-The lock latch, steel cable, and some other moving parts should be lubricated monthly. 
-The hydraulic oil must be replaced once a year. The oil level should always be kept at upper limit 
position. 
-Check the steel cable every three months and if there is some abrasion, something wrong, stops 
using and contact with the manufacturer. 
-Check the integration of the insurance system

 

every day. 

When change hydraulic oil, put machines to the lowest position, have the oil tank empty, 
when add new oil, should be filled by filter. 

Summary of Contents for LJCC2040A

Page 1: ...user s manual 1 TWO POST LIFT LJCC2040A U Us se er r s s m ma an nu ua al l Manufacturer ...

Page 2: ...user s manual 2 MANUFACTURE AND SERVICE AGENT TWO POST LIFT Model Serial no Manufacture date Manufacture Name Address Telephone Fax http E mail AUTHORIZED SERVICE CENTRE ...

Page 3: ...cy request on nameplate only professional electrician is allowed to connect the power Forbid to load vehicle over 4000KG Read the warning content in user s manual carefully We do not take responsibility to the damage due to improper use or operation Manufacturer owns the right to make little changes for the manual owing to the improvement of technology CATALOGUE Catalogue 1 Packing 2 Description o...

Page 4: ...any and Japan 2 3 MAIN FABRIC PRINCIPLE Lifting fabric Each post has one cylinder when pump the oil into the cylinder the cylinder pole will move upwards to hold the carriage move upwards Support fabric After driving the vehicle into the working area adjust the angle of arms and length of extension arms to ensure the arms support on the effective vehicle bearing point Fix the position of vehicle b...

Page 5: ...user s manual 5 Chapter 2 Description of machine 2 4 CONFIGURATION DRAWING Picture 1 dimension drawing ...

Page 6: ...user s manual 6 Chapter 2 Description of machine Picture 2 arm extension drawing ...

Page 7: ...ht 98 160mm Lifting time 50S Lowering time 60S Pass width 2390mm Overall width 3440mm Overall weight 870 kg Voltage AC 400V or 230V 5 50Hz Machine power 2 2 KW Hydraulic oil 13L 20 high abrasive hydraulic oil prepared by user Working temperature 5 40 Working humidity 30 95 Noisy level 76db Installation height Height above sea level 1000M Storage temperature 25 55 Installation place Indoor ...

Page 8: ...arming device water faucet air humidifier and ingle Power supply Before installation get ready for the power supply 3 2 INSTALLATION PROCESS 3 2 1 GENERAL ORIENTATION Lift can only be installed on concrete with steel to reinforce Thickness of concrete 200mm to ensure the intensity reach to 3000PSI 2 1Kg mm2 upwards Height of indoor should be over 4000 mm regard to hold enough space for all lifting...

Page 9: ...2 Check and ensure the posts dimension is in accordance with picture 5 Test the vertical of post with spirit level construction using type 3 2 5 ORIENTATION OF CROSSBEAM 1 Fix the crossbeam according to the drawing That side with limit switch should be installed on the post with hydraulic unit then fasten with screw 2 Fasten the expansion bolt Notice Select suitable steel shim as gasket and insert...

Page 10: ...ding to unlocking device 1 and 2 and tighten the cable with cable clip See picture 8 and picture 9 Important notice Correct standard of unlocking adjustment is as follow When nut of electromagnetic steel core is at the end see picture 9 two safety boards strike close to the carriage to lock the carriage effective When the nut of electromagnetic steel core is at the root of thread two safety boards...

Page 11: ...ect the wires according to electrical diagram and air loop according to air loop diagram Only authorized qualified personnel can install the electrical part Open the control box cover first Power connection Connect the 3 phase five wires 3 2 5mm2 2 1 5 mm2 for the power supply to the terminal of control box according to the circuit diagram If for 230V connection connect to the control box accordin...

Page 12: ... synchronized If not adjust the cable nut 4 4 LOADING TEST To check whether hydraulic system works normally when loading heavy weight Notice Check every oil pipe and fitting to ensure no leakage before operating the lift Use all the arms when lifting vehicle on the recommended point of the chassis Vehicles barycenter must be in the middle of two support arm Remove or install any heavy part one sho...

Page 13: ...light load is normal but no lifting with heavy load The set safe pressure of the over flow valve may be increased by turning the set knob right ward slightly The spool of the lowering solenoid valve is stuck by dirt Clean the spool the amount of hydraulic oil is not enough Add hydraulic oil When lifting operation the motor runs but it is no lifting movement the descend valve is not closed fastened...

Page 14: ...nder piston to move Overflow valve is closed and the pressure is been set before packing in factory to ensure the maximum loading of lift When the system pressure is over max pressure overflow valve will work to have the oil back to oil tank Release UP button motor stops to wok and carriages stop lifting Press DOWN button to connect the electromagnetic steel and open the safety rack pump begins to...

Page 15: ...user s manual 15 7 2 EXPLODED DRAWING OF MAICHINE ...

Page 16: ...user s manual 16 Circuit diagram 220V ...

Page 17: ...user s manual 17 Circuit diagram 380V ...

Reviews: