S/5 Aespire
4-2
1009-0307-000
S/5 Aespire Preoperative tests schedules
Test Intervals
Do the Preoperative tests listed below at these events:
1. Every day before the first patient.
2. Before each patient.
3. When required after a maintenance or service procedure.
The following table indicates when a test must be done and gives a page
number location where the test can be found.
Test intervals
Every day
before the
first patient
Before
every
patient
Inspect the system:
4-4
Test the system:
Power failure alarm test:
4-5
Minimize alarms (optional):
4-5
Pipeline and cylinder tests:
4-6
Flow control tests:
4-7
Vaporizer installation:
4-11
Vaporizer back pressure test:
4-12
Low-pressure leak test:
Negative low-pressure leak test:
4-13
4-13
ISO 5358 or BSI standard positive low-pressure leak test:
4-15
4-15
Alarm tests:
4-16
Breathing system tests:
4-18
4-18
Monitor and ventilator tests:
4-20
4-20