1.1 Safety instructions

DASS TECH inverters must be installed according to the national and local grid standard and 
law. Read and understand the instruction of this manual ,and be familiar with relevant safety 
symbols  in  the  paragraph,  then  start  to  install  and  debug  the  equipment.According  to  the 
national  and  state  requirements,  before  connect  the  grid  ,you  must  get  power  department 
permission, and perform the operation only by qualified electrical engineer.Before installing 
and maintaining the equipment, you should cut off the high voltage application of PV array. 
You can also open the switch of Solar Array Combiner to cut off the high voltage. Otherwise, 
serious injury may be caused.

Qualified persons

The customer must make sure the operator have the necessary skill and training to do his/her 
job.  Staff  in  charge  of  using  and  maintaining  the  equipment  must  be  skilled,  aware  and 
mature  for  the  described  tasks  and  must  have  the  reliability  to  correctly  interpret  what  is 
described  in  the  manual.  For  safety  reason  only  a  qualified  electrician,  who  has  received 
training and / or has demonstrated skills and knowledge in construction and in operation of 
this unit, can install this inverter.

 

DASS Tech Co., Ltd does not take any responsibility for the 

property destruction and personal injury because of any incorrect use.

If  you  have  any  question  or  problem  when  you  read  the  following  information, 
please contact DASS Tech Co., Ltd.

Assembly situation requirements

Please  install  and  start  inverter  according  to  the  following  sections.  Put  the  inverter  in 
appropriate bearing capacity objects(such as wall and components and so on), to ensure that 
inverter vertical placed. Choose suitable place for installing electrical equipment. And assure 
enough  fire  exit  space,  convenience  for  maintenance.  Maintain  proper  ventilation,  and 
ensure that have the enough air cooling cycle.

Transport requirements

If you find packing problems that may cause the damage of the inverter, or find any visible 
damage,  please  immediately  notice  the  responsible  transportation  company.  You  can  ask 
solar equipment installation contractor or DASS Tech Co., Ltd for help if necessary. Transport 
of the equipment, especially by road, must be carried out with by suitable ways and means 
for protecting the components (in particular, the electronic components) from violent shocks, 
humidity, vibration, etc.

Electric connection

Please comply with all the current electrical regulations about accident prevention in dealing 
with the current inverter.

Summary of Contents for DSP 3320i-ODS

Page 1: ...product are subject to change without notice due to quality improvement etc Headquarter 109 Yangcheongsongdae gil Ochang eup Cheongwon gu Cheongju si Chungcheongbuk do 28118 Republic of Korea in Scien...

Page 2: ...llation instructions that must be followed during installation and maintenance of the equipment This manual is for qualified person support person service person are qualified mentioned in this manual...

Page 3: ...23 27 29 29 29 30 30 31 33 45 45 49 50 50 50 50 50 51 51 52 52 53 54 10 1 Standardwarrantyperiod 10 2 Extendedwarrantyperiod 10 3 Invalidwarrantyclause 54 54 54 4 6 DRMsFunctions 4 7 Safetycheck 28 DS...

Page 4: ...nstruction and in operation of this unit can install this inverter DASS Tech Co Ltd does not take any responsibility for the property destruction and personal injury because of any incorrect use If yo...

Page 5: ...d before any repair work After turn off AC breaker and DC switch for 5 minutes later the maintenance or repair of the inverter can be carried out Inverter should work again after removing any faults I...

Page 6: ...gure2 2 Inverter front flank Dimensions 168mm 168mm 135mm 1 DC switch 2 3 PV input terminals 4 DCV A 5 6 RS485 DCV A 7 Breather valve 8 AC Output DCV C DCV C Figure2 1 Interface figure DRM2 6 DRM2 6 D...

Page 7: ...C The DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS User manual DSP 338i ODS User manual...

Page 8: ...DSP 338i ODS 2PCS 2PCS 2PCS 2PCS 3PCS 6PCS AC Output connector 9 10 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 9: ...DSP 338i ODS DSP 338i ODS 3 2 11 12 2 0 5 0 Diameter2 0mm Diameter5 0mm DSP 338i ODS User manual DSP 338i ODS User manual...

Page 10: ...the inverters 3 5 Installing the DSP 338i ODS inverters Figure3 3Manytheinvertersinstallation 13 14 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 11: ...nverters DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS M6 Screws OT Terminal Screw diameter 6mm M6 Threaded hole Figure3 4 15 16 M6 DSP 338i ODS User manual DSP 338i OD...

Page 12: ...DSP 338i ODS The inverters 4 3 4 4 17 18 4 4 4 3 30 50mm 3 5mm DSP 338i ODS 4 6 16A 2 5 4 6 40 60 DSP 338i ODS DSP 338i ODS User manual DSP 338i ODS User manual...

Page 13: ...DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS 4 5 4 6 4 7 4 8 4 9 19 20 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 14: ...DS DSP 338i ODS DSP 338i ODS DSP 338i ODS TERMINAL TERMINAL DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS TERMINAL 4 10 4 11 4 12 21 22 The distance between WIFI and Ethernet router should be le...

Page 15: ...DSP 338i ODS DSP 338i ODS DSP 338i ODS 23 24 4 3 4 13 4 13 4 15 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 16: ...DSP 338i ODS 4 14 4 15 4 16 25 26 DSP 338i ODS 4 16 4 17 4 17 4 17 DSP 338i ODS 4 18 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 17: ...the cables as shown below 4 7 Safety check 2 Provided the DC Power through the PV Pannel until the LCD is working 3 Set inverter country code as 02 Australia in Enter Setting Set Country Code passwor...

Page 18: ...k operators in different countries have different requirements regarding grid connections of PV grid connected inverters Therefore it s very important to make sure that you have selected the correct c...

Page 19: ...160V 180V 31 32 remote off DSP 338i ODS User manual DSP 338i ODS User manual...

Page 20: ...Enset Country Set Energy Set Address Set Inputmode Set Language Set StartPara Set SafetyVolt Set SafetyFreq Set Insulation Set Reactive Set PowerDerat 17 PE Linecontrol 18 Set RefluxP 19 Logic interfa...

Page 21: ...Off Control by pressing UP button or Down button Press OK button and enter On Off Control interface press OK button and enter Input Password Setting interface Press OK button to set passwords default...

Page 22: ...1 Set Time 19 Autotest Fast Up Down Press OK Step 5 Then the Auto Test will start automatically Press down to see the test results Testing 59 S1 Wait Set RefluxP Users press Back button to enter 1 Ent...

Page 23: ...ting 81 S1 81 S1 50 0Hz85ms Test 81 S1 OK Testing 81 S2 Test 81 S2 OK Wait for another test Wait Press Down button to see the test results Wait for another test Wait Press Down button to see the test...

Page 24: ...g 81 S1 Press Down button to see the test results 81 S1 49 9Hz 83ms Testing 81 S2 Wait Wait for another test 81 S1 49 9Hz 83ms Wait Test 81 S1 OK Test 81 S2 OK Press Down button to see the test result...

Page 25: ...338i ODS waterproof waterproof waterproof 4 5 43 44 User can check the current software version in SystemInfo 3 SoftVersion User can check the current software version in SystemInfo 3 SoftVersion 0715...

Page 26: ...normal operating status after correct adjustments Check whether too many PV modules are series connected in a PV string thus the voltage Voc of the PV string is higher than the maximum input voltage...

Page 27: ...rs rectify the fault Ensure the installation position and installation method meet the requirements of Section 3 4 of this user manual Check whether the ambient temperature of the installation positio...

Page 28: ...5 ID96 are internal faults of inverter turn OFF the DC switch wait for 5 minutes then turn ON the DC switch Check whether the fault is rectified If no please contact DASS TECH technical support DASS T...

Page 29: ...8A 44 55Hz 54 66Hz adjustable must meet local grid requirements 98 3 98 GPRS option 25W Current inrush peak and duration 5 5A 28us Maximum output fault current a c A 42A Maximum output overcurrent pr...

Page 30: ...f they fail during the extended warranty period customers need to purchase and replace them from the our company Once the extended warranty service is purchased our company will issue the extended war...

Reviews: