and rekey in the correct passwords.It will enter into ''Power on&Power off'' interface if the 
passwords is correct,then you can select ''Power on'' or ''Power off'' by pressing ''Up'' 
button or ''Down'' button and press ''OK'' button to finish the setting successfully.If you 
select ''Power off'',need to set how many days you want the inverter to power off,increase 
or decrease value though pressing ''Up'' button or ''Down'' button.After you set ''Power off'' 
successfully,you need to contact manufacturer to supply passwords to re-power on this 
inverter.

On-Off Control

Users press ''Back'' button to enter ''1.Enter Setting'' interface,Press ''OK'' button to enter 
main setting interface.Enter ''5.On-Off Control'' by pressing ''UP'' button or ''Down'' button.
Press ''OK'' button and enter On-Off Control interface,press ''OK'' button and enter ''Input 
Password'' Setting interface.Press ''OK'' button to set passwords (default:0001),increase or 
decrease value though pressing ''Up'' button or ''Dwon'' button,press ''OK'' button to next 
value setting.''Error! Try again'' will be displayed for wrong passwords.Press ''back'' button

DSP-338i-ODS
User manual

DSP-338i-ODS
User manual

Clear Energy

Clear Energy

                                                                         
User can check current country code in SystemInfo>>5. Country.
Note: Country code changing will take effect after inverter reboot.

 6 .  Enset   Country

(default:0001)

UK- 59t

G

UK- 83

G

Ukraine

33

34

35

36

37

38

39

40

41

42

43

44

Brazil

Mexico

FAR Arrete23

Denmark Tr322

Wide-Range-60HZ

Ireland EN50438

Thailand PEA

Thailand MEA

LV-Range-50HZ

EU EN50549

South Africa

45

46

47

48

49

AU-WA

Dubai DEWG

Dubai DEWG MV

Taiwan

AU-VIC

100

101

102

103

104

AU-SA

AU-QLD

AU-VAR

AUSGRID

Horizon

Summary of Contents for DSP 3320i-ODS

Page 1: ...product are subject to change without notice due to quality improvement etc Headquarter 109 Yangcheongsongdae gil Ochang eup Cheongwon gu Cheongju si Chungcheongbuk do 28118 Republic of Korea in Scien...

Page 2: ...llation instructions that must be followed during installation and maintenance of the equipment This manual is for qualified person support person service person are qualified mentioned in this manual...

Page 3: ...23 27 29 29 29 30 30 31 33 45 45 49 50 50 50 50 50 51 51 52 52 53 54 10 1 Standardwarrantyperiod 10 2 Extendedwarrantyperiod 10 3 Invalidwarrantyclause 54 54 54 4 6 DRMsFunctions 4 7 Safetycheck 28 DS...

Page 4: ...nstruction and in operation of this unit can install this inverter DASS Tech Co Ltd does not take any responsibility for the property destruction and personal injury because of any incorrect use If yo...

Page 5: ...d before any repair work After turn off AC breaker and DC switch for 5 minutes later the maintenance or repair of the inverter can be carried out Inverter should work again after removing any faults I...

Page 6: ...gure2 2 Inverter front flank Dimensions 168mm 168mm 135mm 1 DC switch 2 3 PV input terminals 4 DCV A 5 6 RS485 DCV A 7 Breather valve 8 AC Output DCV C DCV C Figure2 1 Interface figure DRM2 6 DRM2 6 D...

Page 7: ...C The DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS User manual DSP 338i ODS User manual...

Page 8: ...DSP 338i ODS 2PCS 2PCS 2PCS 2PCS 3PCS 6PCS AC Output connector 9 10 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 9: ...DSP 338i ODS DSP 338i ODS 3 2 11 12 2 0 5 0 Diameter2 0mm Diameter5 0mm DSP 338i ODS User manual DSP 338i ODS User manual...

Page 10: ...the inverters 3 5 Installing the DSP 338i ODS inverters Figure3 3Manytheinvertersinstallation 13 14 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 11: ...nverters DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS M6 Screws OT Terminal Screw diameter 6mm M6 Threaded hole Figure3 4 15 16 M6 DSP 338i ODS User manual DSP 338i OD...

Page 12: ...DSP 338i ODS The inverters 4 3 4 4 17 18 4 4 4 3 30 50mm 3 5mm DSP 338i ODS 4 6 16A 2 5 4 6 40 60 DSP 338i ODS DSP 338i ODS User manual DSP 338i ODS User manual...

Page 13: ...DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS 4 5 4 6 4 7 4 8 4 9 19 20 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 14: ...DS DSP 338i ODS DSP 338i ODS DSP 338i ODS TERMINAL TERMINAL DSP 338i ODS DSP 338i ODS DSP 338i ODS DSP 338i ODS TERMINAL 4 10 4 11 4 12 21 22 The distance between WIFI and Ethernet router should be le...

Page 15: ...DSP 338i ODS DSP 338i ODS DSP 338i ODS 23 24 4 3 4 13 4 13 4 15 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 16: ...DSP 338i ODS 4 14 4 15 4 16 25 26 DSP 338i ODS 4 16 4 17 4 17 4 17 DSP 338i ODS 4 18 DSP 338i ODS User manual DSP 338i ODS User manual...

Page 17: ...the cables as shown below 4 7 Safety check 2 Provided the DC Power through the PV Pannel until the LCD is working 3 Set inverter country code as 02 Australia in Enter Setting Set Country Code passwor...

Page 18: ...k operators in different countries have different requirements regarding grid connections of PV grid connected inverters Therefore it s very important to make sure that you have selected the correct c...

Page 19: ...160V 180V 31 32 remote off DSP 338i ODS User manual DSP 338i ODS User manual...

Page 20: ...Enset Country Set Energy Set Address Set Inputmode Set Language Set StartPara Set SafetyVolt Set SafetyFreq Set Insulation Set Reactive Set PowerDerat 17 PE Linecontrol 18 Set RefluxP 19 Logic interfa...

Page 21: ...Off Control by pressing UP button or Down button Press OK button and enter On Off Control interface press OK button and enter Input Password Setting interface Press OK button to set passwords default...

Page 22: ...1 Set Time 19 Autotest Fast Up Down Press OK Step 5 Then the Auto Test will start automatically Press down to see the test results Testing 59 S1 Wait Set RefluxP Users press Back button to enter 1 Ent...

Page 23: ...ting 81 S1 81 S1 50 0Hz85ms Test 81 S1 OK Testing 81 S2 Test 81 S2 OK Wait for another test Wait Press Down button to see the test results Wait for another test Wait Press Down button to see the test...

Page 24: ...g 81 S1 Press Down button to see the test results 81 S1 49 9Hz 83ms Testing 81 S2 Wait Wait for another test 81 S1 49 9Hz 83ms Wait Test 81 S1 OK Test 81 S2 OK Press Down button to see the test result...

Page 25: ...338i ODS waterproof waterproof waterproof 4 5 43 44 User can check the current software version in SystemInfo 3 SoftVersion User can check the current software version in SystemInfo 3 SoftVersion 0715...

Page 26: ...normal operating status after correct adjustments Check whether too many PV modules are series connected in a PV string thus the voltage Voc of the PV string is higher than the maximum input voltage...

Page 27: ...rs rectify the fault Ensure the installation position and installation method meet the requirements of Section 3 4 of this user manual Check whether the ambient temperature of the installation positio...

Page 28: ...5 ID96 are internal faults of inverter turn OFF the DC switch wait for 5 minutes then turn ON the DC switch Check whether the fault is rectified If no please contact DASS TECH technical support DASS T...

Page 29: ...8A 44 55Hz 54 66Hz adjustable must meet local grid requirements 98 3 98 GPRS option 25W Current inrush peak and duration 5 5A 28us Maximum output fault current a c A 42A Maximum output overcurrent pr...

Page 30: ...f they fail during the extended warranty period customers need to purchase and replace them from the our company Once the extended warranty service is purchased our company will issue the extended war...

Reviews: