
Installation and service manual
Version 2.5
6
2.
Transport
All Vent units are supplied as complete units. On request, the biggest models Vent R/C 6 can be separated
into three parts, allowing easy transport into plant rooms with limited access.
On delivery the unit is placed in upright position on two crossbeams, allowing the use of a forklift truck, a
pallet lifter or a crane for lifting and transporting the unit. If a crane is used, ensure that the unit remains in
balance. Before placing the unit in its final position, remove the crossbeams and fit the height-adjustable
feet to the base frame.
IMPORTANT:
Adjustable feet, which are delivered with the unit, must be fitted before the final positioning! Once the
feet are fitted, the unit must not be pushed any more, only lifted, otherwise the feet will bend or break off.