Installation and start-up
安装和启动
安装和启动
安装和启动
安装和启动
Page 6 of 26
2. Installation and start-up
安装和启动
This section describes the procedure from unpacking to start-up.
在这部分将描述拆包启动的程序。
Package
包装
包装
包装
包装
The unit can be delivered in different packages depending on shipping method,
but the most common solution is each unit is wrapped with film and protected
with paper corners. If that is the case, the film should carefully be cut open with
a cutting tool.
机器必须按运送方式用不同包装来运输,通常解决方法是一台机器用薄膜包住并用护角纸保护
好。这种情况下,薄膜必须用切割工具小心切开。
Contents in
the package
包裹内容
The SSC-01 is delivered with an installation kit with the following content:
SSC-01
附带如下成套装置交货
.
Quantity
Unit
Item description
1
Pcs.
SSC-01
1
1
Pcs.
Pcs,
Service manual
Rejection sheet metal
Tools
工具
For installation:
用于装置
•
DC power supply (48VDC)
直流电源
•
Small screwdriver
一个小螺丝起子
Mounting
装配
装配
装配
装配
Mounting
procedure
装配程序
The mounting procedure of the air condition unit should follow below steps:
1.
Demount the package and mounting bracket screws (4pcs M8&M4).
2.
Mount the unit on the chosen wall with 14 M5 screws with washers.
3.
Mount the frame and door with M4 screws.
4.
Connect the power cable and connector.
此空调必须按照如下步骤安装:
1.
卸下包装和安装支架螺丝钉(
4
颗
M8
和
M4
)
2.
用
14
颗有垫片的
M5
螺丝安装在选好的墙壁上
3.
用
M4
的螺丝安装框架和门
4.
连接电源线和连接器