1 - Introduction

These  instructions  pertain  to  the  VZH  Variable 

Speed scroll compressors used for A/C systems. 

They  provide  necessary  information  regarding 

safety and proper usage of this product.

2 – Handling and storage 

  •   Handle  the  compressor  with  care.  Use  the 

dedicated handles in the packaging. Use the 

compressor  lifting  lug  and  use  appropriate 

and safe lifting equipment.

  •   Store  and  transport  the  compressor  in  an 

upright position.

  •   Store the compressor between -35°C and 55°C.

  •   Don’t expose the compressor and the packa-

ging to rain or corrosive atmosphere.

3 – Safety measures before assembly

 Never use the compressor in a flammable 

atmosphere.

  •   The  compressor  ambient  temperature  may 

not exceed 50°C during off-cycle.

  •   Mount  the  compressor  on  a  horizontal  flat 

surface with less than 3° slope.

  •   The  compressor  can  only  be  supplied  by  a 

frequency converter. Make sure that the frequency 

converter is the dedicated one for the compressor 

(power  size  and  voltage:  input  &  output). 

Parameter 1.13 of the frequency converter lists the 

possible combinations of compressors, frequency 

converters and refrigerants.

  •   When installing a VZH, use equipment specifi-

cally reserved for HFC refrigerants which was 

never used for CFC refrigerants.

  •   Use clean and dehydrated refrigeration-grade 

copper tubes and silver alloy brazing material.

  •   Use clean and dehydrated system components.

  •   The piping connected to the compressor must 

be flexible in 3 dimensions to dampen vibrations.

  •   Make  sure  the  installation  is  equipped  with 

high-pressure safety components (e.g. pressure 

switch, pressure relief valve) to prevent against 

the  bursting  of  pressure-containing  compo-

nents.

4 - Assembly

  •   Slowly  release  the  nitrogen  holding  charge 

through the schrader port.

  •   Connect  the  compressor  to  the  system  as 

soon  as  possible  to  avoid  oil  contamination 

from ambient moisture.

  •   Avoid material entering into the system while 

cutting  tubes.  Never  drill  holes  where  burrs 

cannot be removed.

  •   Braze with great care using state-of-the-art tech-

nique and vent piping with nitrogen gas flow.

  •   Connect the required safety and control de-

vices. When the schrader port is used for this, 

remove the internal valve.

5 – Leak detection

  Never  pressurize  the  circuit  with  oxygen  or 

dry air. This could cause fire or explosion.

  •   Do not use dye for leak detection.

  •   Perform a leak detection test on the complete 

system.

  •   The low side test pressure must not exceed 30 bar.

  •   When a leak is discovered, repair the leak and 

repeat the leak detection.

6 – Vacuum dehydration

  •   Never use the compressor to evacuate the system.

  •   Connect a vacuum pump to both the LP & HP sides.

  •   Evacuate the system to a pressure of 500 µm 

Hg (0.67 mbar) absolute.

  •   Do not use a megohmmeter nor apply power 

to the compressor while it is under vacuum as 

this may cause internal damage.

7 – Electrical connections

  •   Switch off and isolate the main power supply. 

See previous page for wiring details.

  •   The  compressor  is  protected  against  excess 

current by the frequency converter. Follow local  

regulations  regarding  power  line  protection. 

The compressor must be connected to ground.

  •   All electrical components must be selected as per 

local standards and compressor requirements.

  •   Please refer to drawings for typical wiring connec-

tions  and  examine  the  specific  wiring  diagram 

located in the frequency converter package. For 

further details, refer to the application guidelines.

  •   Follow very closely the installation instruction 

for the frequency converter:

 

 - Mounting: The base frame of the frequency 

converter  must  be    very  well  fixed  to  the 

support  to  ensure  a  very  good  continuity 

between the ground potential of all electrical 

panels and electrical boxes of the system.

 

 - Wiring: All control wires have to be of a screee-

ned design. The cable for electrical motor sup-

ply has to be of a shielded design as well. Cor-

rect earthing of the shield cover has to be done 

using the method shown on drawings, every 

time this one has to be earthed on each end 

of the cables. Distinct cable trays must be used 

for control and motor supply.

  •   The  frequency  converter  ensures  direct  motor 

protection  and  the  factory  set  parameters  are  

such to protect the motor over all current mal-

functions. An external overload is not necessary.

  •   Set  the  frequency  converter  parameters  in 

accordance  with  Danfoss  recommendations 

for the CDS303 frequency converter and VZH 

variable speed compressor.

8 – Filling the system

  •   Keep the compressor switched off.

  •   Fill  the  refrigerant  in  liquid  phase  into  the  

outlet side of the condenser or liquid receiver. 

The charge must be as close as possible to the 

nominal system charge to avoid low pressure 

operation and excessive superheat.
Compressor

Refrigerant charge limit (kg)

VZH088

5.9 

VZH117

7.9 

VZH170

13.5

Above this limit; protect the compressor against 

liquid flood-back with a pump-down cycle not 

lower than 2.3 bar (g) or a suction line accumu-

lator.

  •   Never leave the filling cylinder connected to 

the circuit to avoid overfilling.

9 – Verification before commissioning

  Use  safety  devices  such  as  safety  pressure 

switch and mechanical relief valve in compliance 

with both generally and locally applicable regu-

lations  and  safety  standards.  Ensure  that  they 

are operational and properly set. 

    Check  that  the  settings  of  high-pressure 

switches  and  relief  valves  don’t  exceed  the 

maximum service pressure of any system com-

ponent.

  •   A  low-pressure  switch  is  mandatory  to  avoid 

vacuum operation. Minimum setting 1.5 bar (g).

  •   Verify that all electrical connections are properly 

fastened  and  in  compliance  with  local  regula-

tions.

  •   The  crankcase  heater  function  is  factory  preset 

to "disabled". It must not be used for VZH170 but 

could be used for VZH088/117. In default case, an 

external crankcase heater is required.

  •   After comissioning it is strongly recommended to 

keep the frequency converter always energized.

10 – Start-up

  •   All service valves must be in the open position.

  •   Balance the HP/LP pressure.

  •   Energize the compressor. It must start promptly. 

  •   If the compressor doesn’t start, verify that the 

compressor  is  hooked  up  to  the  frequency 

converter; check the power lead connections. 

If  these  verifications  reveal  no  abnormality, 

check the motor windings with an ohmmeter.

  •   Check  the  frequency  converter  control  pa-

nel: If any alarm is displayed check the wiring 

and  in particular the polarity of the control 

cables. If an alarm is shown, refer to the fre-

quency  converter  application  manual. Verify 

in particular the combination of compressor, 

frequency converter and refrigerant.

  •   Check current draw and voltage levels on the 

mains.  The  values  for  the  compressor  elec-

trical motor can be directly displayed on the 

frequency converter control panel.

  •   The optimum compressor suction superheat  

is  around  6K.  The  maximum  allowed  super- 

heat is 30K.

11 – Check with running compressor

  •   Check current draw and voltage.

  •   Check  suction  superheat  to  reduce  risk  of 

slugging.

  •   Observe the oil level at start and during opera-

tion to confirm that the oil level remains visible.

Excess foaming in oil sight glass indicates refri-

gerant on the sump.

  •   Monitor the oil sight glass for 1 hour after sys-

tem equilibrium to ensure proper oil return to 

the compressor. This oil check has to be done 

over the speed range to guarantee:

 

 - a good oil return at low speed with mini-

mum gas velocity.

 

 -  a  good  oil  management  at  high  speed 

with maximum oil carry over.

  •   Respect the operating limits.

  •   Check all tubes for abnormal vibration. Move-

ments in excess of 1.5 mm require corrective 

measures such as tube brackets.

  •   When  needed,  additional  refrigerant  in  the 

liquid phase may be added in the low-pressure 

side  as  far  as  possible  from  the  compressor. 

The  compressor  must  be  operating  during  this 

process.

  •   Do not overcharge the system.

  •   Never release refrigerant to the atmosphere.

  •   Before leaving the installation site, carry out 

a  general  installation  inspection  regarding 

cleanliness, noise and leak detection.

  •   Record  type  and  amount  of  refrigerant  charge 

as well as operating conditions as a reference for 

future inspections.

  •   Compressor failure to build up pressure: Check 

all  bypass  valves  in  the  system  to  ensure  that 

none of these has been opened. Also check that 

all solenoid valves are in their proper position.

  •   Abnormal running noise: Ensure the absence 

of any liquid flood-back to the compressor by 

means of measuring the return gas superheat 

and  compressor  sump  temperature.  The 

sump should be at least 6K above the satura-

ted  suction  temperature  under  steady-state 

operating conditions.

  •   The  high-pressure  switch  trips  out:  Check 

condenser operations (condenser cleanliness, 

fan operation, water flow and water pressure 

valve,  water  filter,  etc.).  If  all  these  are  OK, 

the  problem  may  be  due  to  either  refrige-

rant overcharging or the presence of a non-

condensable (e.g. air, moisture) in the circuit.

  •   The low-pressure switch trips out: Check evapo-

rator operations (coil cleanliness, fan operations, 

water  flow,  water  filter,  etc.),  liquid  refrigerant 

FRCC.EI.024.A1.02 © Danfoss Commercial Compressors 10/12

3

Instructions