background image

Procedure

1.

Disconnect power to the drive.

2.

Disconnect power to the live part connections on the relay terminals.

3.

Remove the LCP or the blind cover.

4.

Remove the terminal cover.

5.

Remove the control cables.

6.

Remove the cable decoupling plate.

For enclosure sizes A2 and A3, also remove the plastic cover underneath the decoupling plate (if installed).

7.

Insert the option in the D-option slot.

8.

Mount the cable decoupling plate.

9.

Connect the control cables and relieve the cables with the enclosed cable strips.

10.

Attach the terminal cover and the LCP, or the blind cover.

11.

Connect power to the drive.

Example:

3

4

5

e

3

0

b

g

0

4

6

.1

0

1

2

1

LCP

3

Cable decoupling plate

5

D-option slot

2

Terminal cover

4

D-option

Illustration 2:  Installing a D-Option in an A2/A3 Enclosure

Scope of Delivery, Safety, and Installation

Installation Guide  | VLT® 24 V DC Supply MCB 107

AN287957936346en-000101 / 130R0308

4 | Danfoss A/S © 2018.11

Reviews: