background image

State

LED

Description

Power up

Red/
green:

Solid red/green

The device is powering up (after MS LED).

Running

Green:

Flashing green

No IP address is configured.

Green:

Solid green

The link is active and the IP address is configured.

Red:

Solid red

The IP address assigned to the device is already in
use.

Off

 

Off

There is no link or the link has been removed after
valid IP address has been entered.

Table 4.3 NS1+NS2: Network Status (1 per Port)

4.2.2 No Communication with the

Frequency Converter

Check: Link status

The status of the Ethernet link can be directly identified
using the LEDs, when no BACnet connection is established.

Use 

parameter 12-10 Link Status

 to verify presence of the

link.
Use 

parameter 12-11 Link Duration

 to verify that the link is

steadily present.
The parameter shows the duration of the present link, and
is preset to 00:00:00:00 when the link is broken.

Check: Cabling

In rare cases of cabling misconfiguration, the option may
show the presence of a link but no communication is
running. Exchange the cable if in doubt.

Check: IP address

Verify that the option has a valid IP address (refer to

parameter 12-01 IP Address

). When the option has identified

a duplicate IP Address, NS LEDs are steady red. When the
option is set up for BOOTP or DHCP, verify that a BOOTP or
DHCP Server is connected in 

parameter 12-04 DHCP Server

.

If no server is connected, the parameter shows:
000.000.000.000.

Troubleshooting

VLT

®

 BACnet/IP MCA 125

14

Danfoss A/S © 05/2016 All rights reserved.

MG92K102

4

4

Summary of Contents for VLT BACnet/IP MCA 125

Page 1: ...MAKING MODERN LIVING POSSIBLE Installation Guide VLT BACnet IP MCA 125 VLT HVAC Drive FC 102 vlt drives danfoss com...

Page 2: ......

Page 3: ...3 3 Grounding 6 3 4 Cable Routing 6 3 5 Topology 7 3 5 1 Topology Types 7 3 5 1 1 Star Topology 7 3 5 1 2 Line Topology 7 3 5 1 3 Ring Redundant Topology 8 3 5 1 4 Recommended Design Rules 8 3 6 Moun...

Page 4: ...configuring the system controlling the frequency converter parameter access programming troubleshooting and some typical application examples Supplementary publications and manuals are available from...

Page 5: ...er PLC Programmable logic controller TCP Transmission control protocol Table 1 1 Symbols and Abbreviations Conventions Numbered lists indicate procedures Bullet lists indicate other information and de...

Page 6: ...DC supply or load sharing the motor may start at any time Unintended start during programming service or repair work can result in death serious injury or property damage The motor can start with an...

Page 7: ...injury Ensure that only trained and qualified personnel perform installation start up and maintenance Ensure that electrical work conforms to national and local electrical codes Follow the procedures...

Page 8: ...ctrical contact between the cable screen and the frequency converter enclosure or ground is not allowed in Ethernet installations The RJ45 connector of the Ethernet interface provides an electrical pa...

Page 9: ...thernet switch When the update time is too short the delay can lead to a timeout in the BMS Set the update time as shown in Table 3 1 The numbers given are typical values and can vary from installatio...

Page 10: ...active network components when designing an Ethernet network For line topology a small delay is added with each additional switch in the line For more information see Table 3 1 Do not connect more th...

Page 11: ...t Facing Upward A1 A3 Enclosures 130BD925 10 Illustration 3 8 Option Mounted with the Ethernet Port Facing Downward A4 A5 B C D E F Enclosures 130BD910 10 2 4 3 M12 PIN RJ45 8 1 1 Signal M12 PIN RJ45...

Page 12: ...providing galvanic isolation 3 7 2 Wiring Procedures Wiring procedure for enclosure types A1 A3 1 Mount the pre configured cable wires with the connectors on the fieldbus option For A1 and A2 enclosur...

Page 13: ...the metal base plate using the springs see Illustration 3 12 3 Tie down the cable and route it with other control wires inside the unit see Illustration 3 12 130BC527 10 Illustration 3 12 Wiring for E...

Page 14: ...Control Timeout Time Parameter 8 70 BACnet Device Instance Parameter 12 71 BACnet Datalink If BACnet IP is used the following parameters must be set correctly Parameter 12 00 IP Address Assignment Par...

Page 15: ...MS Module status Reflects the activity on the BACnet IP stack NS1 Network status 1 Reflects the activity on Ethernet port 1 NS2 Network status 2 Reflects the activity on Ethernet port 2 Table 4 1 LED...

Page 16: ...Status to verify presence of the link Use parameter 12 11 Link Duration to verify that the link is steadily present The parameter shows the duration of the present link and is preset to 00 00 00 00 w...

Page 17: ...6 H High voltage 4 I Installation EMC compliant 6 Intended use 2 Items supplied 2 L Leakage current 5 LED 3 Line topology 7 Load sharing 4 M Motor wiring 6 Mounting 8 N Network cabling 12 Q Qualified...

Page 18: ...ucts already on order provided that such alterations can be made without subsequential changes being necessary in specifications already agreed All trademarks in this material are property of the resp...

Reviews: