3.7 Electrical Installation
3.7.1 Cabling Requirements
•
Select cables suitable for Ethernet data
transmission. Normally, CAT5e and CAT6 cables
are recommended for industrial applications.
•
Both types are available as unshielded twisted
pair and shielded twisted pair. Shielded cables are
recommended for use in industrial environments
and with frequency converters.
•
A maximum cable length of 100 m (328 ft) is
allowed between the switches.
•
Use optical fibers for gapping longer distances
and providing galvanic isolation.
3.7.2 Wiring Procedures
Wiring procedure for enclosure types A1–A3
1.
Mount the pre-configured cable wires with the
connectors on the fieldbus option. For A1 and A2
enclosures, mount the supplied strain relief on
top of the frequency converter with 2 screws, as
shown in
Illustration 3.10
. For cable specifications,
refer to
chapter 3.7.1 Cabling Requirements
.
2.
Position the cable between the spring loaded
metal clamps to establish mechanical fixation and
electrical contact between the cable and ground.
130
BT797.11
Illustration 3.10 Wiring for Enclosure Types A1–A3