![Danfoss VLT 4000 Instructions Manual Download Page 9](http://html1.mh-extra.com/html/danfoss/vlt-4000/vlt-4000_instructions-manual_3892477009.webp)
The cutout is made on the inner most gland plate
Remove the remaining two gland plates for the
installation of the bottom duct assembly.
Photo 26. Enclosure bottom cutout
The bottom duct work is rotated into place as
shown in Sketch. 1. The bottom duct work is de-
signed to fit tightly. The upper part of the duct
fits under the bottom duct adapter and requires a
tight seal, permitting the enclosure to maintain its
IP54 and UL & NEMA 12 ratings.
Photo 27. Bottom duct work installed
Sketch 1. Installation of bottom duct
Instruction No: 175R5640 V3
Aug 13, 2008
Page 9