All versions of the DC Bus Test Harness have male/female plugs to allow piggyback connection to the required
voltage measurement points on the Soft-Start. Refer to Figure 1-11 DC Bus Test Harness Diagram (Closed-Top Soft
Start) and Figure 1-12 DC Bus Test Harness Diagram (Open-Top Soft Start) on page 26. for an example of the two
current harnesses. Voltage measurements are made via shrouded multimeter jacks on the opposite end of the
cables. Cable and personal protection are provided by inline fast-acting fuses (1/4 x 1 1/4, 62 milliamp 250V) and
current-limiting 100kΩ 3W resistors.
Figure 1-11 DC Bus Test Harness Diagram (Closed-Top Soft Start)
Figure 1-12 DC Bus Test Harness Diagram (Open-Top Soft Start)
• • • CAUTION • • •
Before using the DC bus test harness, integrity of the fuses/resistors in the harness and cable must be checked.
1.10.1 General Verification and Installation of the DC Bus Test Harness
1. Isolate the compressor power as described in Section 1.8 Electrical Isolation on page 22.
• • • CAUTION • • •
Use your ESD wrist strap before touching the Soft Start Board or any electronic components.
2. Use an ESD strap and attach it the compressor housing while installing the Test Harness.
3. Remove the Service Side Cover. Refer to Section 4.1.3.1 Service Side Cover Removal and Installation on
• • • CAUTION • • •
Use your ESD wrist strap before touching the Soft Start Board or any electronic components.
Page 26 of 294 - M-SV-001-EN Rev. H 1/23/2023
Summary of Contents for Turbocor TT Series
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 294 M SV 001 EN Rev H 1 23 2023...
Page 14: ...Page 14 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...Page 16 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 18: ...Figure 1 2 New Type Code Page 18 of 294 M SV 001 EN Rev H 1 23 2023...
Page 46: ...Page 46 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 250: ...Page 250 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 268: ...Figure 5 3 Bearing Calibration Flow Page 268 of 294 M SV 001 EN Rev H 1 23 2023...
Page 274: ...Page 274 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 286: ...Page 286 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 290: ...Page 290 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 292: ...Page 292 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...