Commissioning (RF models only) 

If the thermostat and the receiver have been supplied together in 
a combined pack, the units have been paired in the factory and no 
commissioning is required (RX1 only).

To tune the RX receiver to the frequency of the thermostat signal, follow 
steps 1-5 below.

 

Step 1  TP5000-RF

 

Reset the unit by pressing and 
holding

 -, +, V and 

Λ

 together

 

until display goes blank.

Step 2

  Press and hold 

V and +

  

 

buttons for 3 seconds  (TP5000 
now transmits unique signal continuously for 5 minutes).

Step 3  RX1

 

Press and hold buttons 

PROG 

and CH1

 for 3 seconds until green 

light fl ashes once.

Step 4  RX2 (if applicable)

 

Stat 1 - perform steps 1-3. 

 

Stat 2 - wait 5 mins, perform steps 1-2 and then press 

PROG and CH2 on RX2.

 

RX3  (if applicable)

 

 

Stat 1 - perform steps 1-3.

 

Stat 2 - wait 5 mins, perform steps 1-2 and then press 

PROG and CH2 on RX3.

 

Stat 3 - wait 5 mins, perform steps 1-2 and then press 

PROG and CH3 on RX3.

Step 5  TP5000-RF

 Press 

V or

  

Λ

  to select temperature - the unit will revert back 

to operating mode. 

Installa

tion Instruc

tions

GB

Summary of Contents for TP5000 RF Si

Page 1: ...cciones de instalaci n Instrucciones del usuario Instruktions vejledning Brugervejleding Electronic 5 2 day programmable room thermostat Installatie handleiding Instructiesevoor Gebruik Instrukcja ins...

Page 2: ...Instrucciones de instalaci n 34 37 Instrucciones del usuario 38 43 Instruktions vejledning 44 47 Brugervejleding 48 53 Installatie handleiding 54 57 Instructiesevoor Gebruik 58 63 64 67 68 73 Instruk...

Page 3: ...nt edition of the IEEE wiring regulations Thermostat features TP5000 TP5000 RF Power supply 2 x AA MN1500 LR alkaline cells Memory back up 1 min for battery change Switching action of output relay 1 x...

Page 4: ...mm below in order to mount the plug in module Fix at a height of approximately 1 5m from the floor away from draughts or heat sources such as radiators open fires or direct sunlight Prior to mounting...

Page 5: ...stats will have a Neutral and or Earth wire connected These are not required by theTP5000 and must NOT be connected to anyTP5000 terminals Instead they should be made electrically safe and coiled in t...

Page 6: ...d buttons for 3 seconds TP5000 now transmits unique signal continuously for 5 minutes Step 3 RX1 Press and hold buttons PROG andCH1 for 3 seconds until green light flashes once Step 4 RX2 if applicabl...

Page 7: ...fortable with at the different times you have chosen and then leave it alone to do its job The best way to do this is to set low temperatures first say 18 C and then turn them up by one degree each da...

Page 8: ...ure display Preset Programmes Your TP5000 comes ready programmed with a set of operating times and temperatures which often suit most people If you want to change any of these settings you can do so b...

Page 9: ...ay 1 and the temperature to 20 C Setting the Clock Day Note clockisdisplayedin24hourmode CLOCK Press PROG to begin programming Use or to adjust the TIME press and hold to change in 10 min increments D...

Page 10: ...d the programme set up to that minute will be active If at any time you get confused and need to reset the unit to the preset programmes press the AND buttons simultaneously 20 i2 24 Before you change...

Page 11: ...4 5 6 For Days 6 7 weekends Press PROG until 1st pre set time and temperature Event 1 Days 6 7 appears in display Repeat steps b c and d above to programme time and temperature events for the weekend...

Page 12: ...next programmed event Press and together once This override cancels at 2 00am Sometimes you may need to change the way you use your heating temporarily i e due to unusually cold weather TheTP5000 has...

Page 13: ...ever goes blank during normal operation the batteries will need to be renewed the unit reset and the time and programmes reset 16 03 57 Frost Protection Press and together twice Use or buttons to set...

Reviews: