3.0 Safety notes

3.1 Safety Notes – general

The following instructions refer to the standard design of
substation. Special versions of substations are available on
request.

This operating manual should be read carefully before installation
and start-up of the substation. The manufacturer accepts no
liability for damage or faults that result from non-compliance with
the operating manual. Please read and follow all the instructions
carefully to prevent accidents, injury and damage to property.
Assembly, start-up and maintenance work must be performed by
qualified and authorized personnel only.
Please comply with the instructions issued by the system
manufacturer or system operator.

Corrosion protection

All pipes and components are made of stainless steel and brass.
The maximum chloride compounds of the flow medium should not
be higher than 150 mg/l.
The risk of equipment corrosion increases considerably if the
recommended level of permissible chloride compounds is
exceeded.

Energy source

The substation is designed for district heating as the primary
source of energy. However, also other energy sources can be used
where the operating conditions allow it and always are comparable
to district heating.

Application

The substation is designed to be connected to the house
installation in a frost-free room, where the temperature does not
exceed 50 °C and the humidity does not exceed 60%. Do not cover
or wall up the substation or in any other way block the entrance
to the station.

Choice of material

Choice of materials always in compliance with local legislation.

Safety valve(s)

We recommend mounting of safety valve(s), however, always in
compliance with local regulations.

Connection

The substation must be equipped with features that ensure that
the substation can be separated from all energy sources (also
power supply).

Emergency

In case of danger or accidents - fire, leaks or other dangerous
circumstances - interrupt all energy sources to the station if
possible, and seek expert help.
In case of discoloured or bad-smelling domestic hot water, close all
shut-off valves on the substation, inform the operating personnel
and call for expert help immediately.

Storage

Any storage of the substation which may be necessary prior to
installation should be in conditions which are dry and heated.

Authorized personnel only

Assembly, start-up and maintenance work must be performed by
qualified and authorized personnel only.

Please observe instructions carefully

To avoid injury to persons and damage to the device, it is absolutely
necessary to read and observe these instructions carefully.

Warning of high pressure and temperature

Be aware of the installation’s permissible system pressure and
temperature.

The maximum temperature of the flow medium in the substation is
120 °C.

The maximum operating pressure of the substation is 10 bar. PN 16
versions are available on enquiry.

The risk of persons being injured and equipment damaged increases
considerably if the recommended permissible operating parameters

are exceeded.
The substation installation must be equipped with safety valves,

however, always in accordance with local regulations.

Warning of hot surface

The substation has got hot surfaces, which can cause skin burns.

Please be extremely cautious in close proximity to the substation.
Power failure can result in the motor valves being stuck in open

position. The surfaces of the substation can get hot, which can cause
skin burns. The ball valves on district heating supply and return should

be closed.

Warning of transport damage

Before substation installation, please make sure that the substation

has not been damaged during transport.

IMPORTANT - Tightening of connections

Due to vibrations during transport all flange connections, screw joints
and electrical clamp and screw connections must be checked and
tightened before water is added to the system. After water has been
added to the system and the system has been put into operation,
re-tighten

ALL

connections.

Danfoss Heating

VI.CW.J3.02 / LUK38000

DEN-GT

3

Summary of Contents for Termix One-B

Page 1: ...ral 3 4 0 Mounting 4 4 1 Mounting 4 5 0 Design 6 5 1 Design 6 5 2 Schematic diagram 7 6 0 Controls 9 6 1 DHW temperature control 9 6 2 Maintenance 10 7 0 Troubleshooting 11 7 1 Troubleshooting in gene...

Page 2: ...ly thereby creating a very good operation economy Domestic hot water DHW The domestic hot water is prepared in the heat exchanger and the temperature is regulated with a thermostatic control valve The...

Page 3: ...rous circumstances interrupt all energy sources to the station if possible and seek expert help In case of discoloured or bad smelling domestic hot water close all shut off valves on the substation in...

Page 4: ...1 Domestic cold water DCW 2 Domestic hot water DHW 3 District heating DH supply 4 District heating DH return Connection sizes DH G int thread DCW DHW G int thread Dimensions mm Type 1 2 without cover...

Page 5: ...rinse Prior to installation all substation pipes and connections should be cleaned and rinsed Thightening Due to vibration during transport all substation connections must be checked and tightened bef...

Page 6: ...B 5 0 Design 5 1 Design Your substation might look different than the substation shown Design description B Heat exchanger DHW O Termix sensor accelerator 7 Thermostatic controller DHW 6 DEN GT VI CW...

Page 7: ...Second diagram Termix One Q with safety valve Schematic description B Heat exchanger DHW 7 Thermostatic valve 2 Single check valve 21 To be ordered separately 4 Safety valve 62 GTU Pressure equalizer...

Page 8: ...parameters Technical parameters Nominal pressure PN 16 Max DH supply temperature 120 C Min DCW static pressure 0 5 bar Brazing material HEX Copper Heat exchangers test pressure 30 bar Sound level 55 d...

Page 9: ...of up to 90 C Thermostatic control DHW temperature is adjusted as follows To increase temperature turn the handle on the thermostatic controller to select a higher number To decrease temperature turn...

Page 10: ...gular intervals and to write down the meter readings Regular inspections of the substation according to this Instruction are recommended which should include Strainers Cleaning of strainers Meters Che...

Page 11: ...efective or clogged non return valve Replace clean No electricity Check Wrong setting of automatic controls if any To adjust an electronic controller for DHW pls note enclosed instructions for electro...

Page 12: ...7 3 Disposal Disposal This product should be dismantled and its components sorted if possible in various groups before recycling or disposal Always follow the local disposal regulations 12 DEN GT VI C...

Page 13: ...Installation Guide Termix One B Danfoss Heating VI CW J3 02 LUK38000 DEN GT 13...

Page 14: ...Installation Guide Termix One B 14 DEN GT VI CW J3 02 LUK38000 Danfoss Heating...

Page 15: ...gory 0 without electrical equipment covered by this declaration are in conformity with the following directives standards and other normative documents provided that they are used according to our ins...

Page 16: ...Installation Guide Termix One B Produced by Danfoss A S 05 2013...