Three point controlled actuators 

AMV 10, AMV 20, AMV 30
AMV 13, AMV 23, AMV 23 SU, AMV 33 - spring return function

DH-SMT/SI

 

ED.95.N5.02  ©  Danfoss  05/2007 

Description

 

AMV 10 

AMV 13 

AMV 20,  AMV 30  

AMV 23 (23 SU), AMV 33

The actuators with or without safety function are 

available for 3-point controls. The spring return 

actuators can be used to provide safety shut off 

on power failure. They are used with VS2, VM2, 

VB2, VMV and AVQM valves.
In addition to basic function such as manual 

control and position indication, the actuators are 

also equipped with force sensitive switch-off to 

ensure that actuators and valves are not exposed 

to overload. This function automatically ensures 

the self-adjustment of the end positions on the valve.

Main data:
•  24 V and 230 V version
•  AMV 10, 13 - spindle speed 14 s/mm
•  AMV 20, 23, 23 SU - spindle speed 15 s/mm
•  AMV 30, 33 - spindle speed 3 s/mm
•  spring return function (DIN 32730 

registration).

Ordering

Type

Supply voltage

Code No.

AMV 10

230 V~

082G3001

AMV 10

24 V~

082G3002

AMV 20

230 V~

082G3007

AMV 20

24 V~

082G3008

AMV 30

230 V~

082G3011

AMV 30

24 V~

082G3012

Spring return function - DIN 32730 approval

Type

Supply voltage

Code No.

AMV 13

230 V~

082G3003

AMV 13

24 V~

082G3004

AMV 23

230 V~

082G3009

AMV 23

24 V~

082G3040

AMV 23 SU

230 V~

082G3041

AMV 23 SU

24 V~

082G3010

AMV 33

230 V~

082G3013

AMV 33

24 V~

082G3014

Accessories for AMV 20/23, AMV 30/33

Type

Code No.

Additional switch (2×)

082G3201

Additional switch (2×) and potentiometer (10 kΩ)

082G3202

Additional switch (2×) and potentiometer (1 kΩ)

082G3203

7369053-0 SIBC

VI.HB.C1.00 © Danfoss 5/02

1

Instructions

VM2, VB2    2-way

065R9074

065R9074

DN

L (mm)

15

65

20

70

25

75

32

100

40

110

50

130

DN

L

1

(mm)

15

131

20

142

25

159

32

196

40

196

50

228

DN

L

2

(mm)

15

139

20

154

25

159

32

184

40

294

50

330

DN

L

3

(mm)

15

69

20

74

25

79

32

104

40

114

50

134

VM2

VB2

7369220-2

EI.96.A1.00 © Danfoss 02/02

1

1

Instructions

AMV 20, AMV 30

082R9092

082R9092

AMV 20, AMV 30 + VM2, VS2

AMV 20, AMV 30 + AVQM

AMV 20, AMV 30 + VB2

2

3

4

N - 1

N - 3

or

ALPHA2 L

GRUNDFOS

 

INSTRUCTIONS

www.grundfos.com/ALPHA2L

GB

Installation and operating instructions

F

Notice de montage et de mise en service

E

Instrucciones de instalación 

y funcionamiento

I

Istruzioni di montaggio, uso e 

manutenzione

GR

������� ������������ ��� �����������

TR

Montaj ve kullanma k�lavuzu

H

Beépítési és üzemeltetési utasítás

PL

Instrukcja monta�u i obs�ugi

Wilo-Star-Z NOVA

16

09

8-

Ed.0

1/

20

11

-11

-W

ilo

9. 

Adjustment and commissioning, DHW circuit - App. A266 

Danfoss ECL Comfort 310 - Application A266

The substation is supplied with an Danfoss ECL 310 controller. The 

ECL controller is supplied with an ECL Application Key A266, which 

is adapted to the type of system, for which electronic control of the 

DHW circuit is wanted.

Note! Various applications can be loaded.

The controller is factory-set for local language and the running time 

for the actuator (DHW circuit) is preset for the actual application. 

General controller settings such as “Time and Date” must be entered 

during commissioning of the controller. And also the desired DHW 

temperature must be set. 

Please refer to the enclosed manufacturer instructions for the ECL 

210/310 controller in order to 

set the  required domestic hot water 

temperature

ECL Application Key Box with ECL Comfort 210/310 user guide and 

mounting guide, for further information.

 

We recommend that that your order commissioning of the controller 

with your local Danfoss Sales Company.

 

Ac valve,  unit with control of the heating and DHW cir-

cuits, Application A266

For controlling the domestic hot water circuit the S 22, A266 is sup-

plied with Danfoss AMV 30 actuator with Danfoss valve housing 

type VM2 placed on the primary return flow pipe. The AMV actuator 

is electrically wired to the controller from the plant.

Factory-setting 

The actuator has undergone a functional test and is preset from 

factory.

In the event of operating disturbances the actuator can be shut off 

manually  in accordance with enclosed instructions, by turning the 

manual override knob on top of the actuator clockwise. Please note 

that the knob can be “tight” to turn.

For additional information see the manuals: 

AMV30 and VM2.

Circulation pump (DHW recirculation)

Start-up of circulation pump

The unit comes standard with a circulation pump, Wilo-Star-Z 

Nova.   

The pump is electrically connected to the ECL controller from fac-

tory. 

Start-up:

• 

Turn on the water supply

• 

Open the faucet farthest away in the system and let it run until 

   no more air is coming out of the faucet

• 

The pump is controlled by the ECL controller and  the pump rotor 

   space bleeds automatically after a short time in operation. (There 

   may be some noise during this phase).

For additional information see the manual for

 

Wilo-Star-Z NOVA

Alternatively a Grundfos Alpha2 L 15-40 CIL2 circulation pump may 

be fitted in the unit. Set the pump to “Constant-pressure curve - in 

pos. I II or III, in accordance with manual.

For additional information see the manal for 

GRUNDFOS

 ALPHA2 L.

11

11

Instructions for installation and use 

S 22

 

Danfoss District Energy 

VI.IE.D1.02 

DKDHR

Summary of Contents for S 22

Page 1: ...Danfoss District Energy MAKING MODERN LIVING POSSIBLE S 22 Instructions for installation and use S 22 Instructions for installation and use ...

Page 2: ...llation instructions connection safety and handling 5 5 Installation instructions GETTING STARTED 6 6 Installation instructions general 7 7 Electrical connections ECL Comfort 310 8 8 Adjustment and commissioning heating circuit 9 9 Adjustment and commissioning DHW circuit App A266 11 10 Operation and maintenance 12 11 Maintenance plan 13 12 Troubleshooting 14 13 EU Declaration of Conformity 16 14 ...

Page 3: ...mp HE Circulation pump DHW Thermometer DHW Thermometer HE supply Thermometer HE return Safety valves DHW Air valve Manometer DH supply Manometer DH return Fitting piece for heat meter optional Alternative equipment Fitted standard pump can be replaced with an A labelled Grundfos pump Please contact our sales department for further information Accessories available as extra equipment White cover wi...

Page 4: ...istrict heating water has a significant effect on the overall energy economy Please note that the district heating return temperature is directly related to the return tempera ture from the heating circuit and the return temperature from the DHW plate heat exchanger Therefore it is important to focus on the supply and return temperature in the heating system The difference should typically be 30 3...

Page 5: ...rts of the unit may be very hot and can cause burn injuries Be very carefulwhenyouareintheimmediatevicinityoftheunit Warningsabouthighpressureandhightemperature The maximum supply temperature in the district heating network can be up to 120 C and the operating pressure can be up to 16 bar This may result in a risk of scalding from touching the unit and from outflowofthemedium Exceedingtheunitdesig...

Page 6: ...ections as they may have loosened during transport and handling do NOT overtighten check that the air valve in top of the unit is closed 4 Establish a drain connection on the safety valves in compli ance with the aplicable legislation 5 Open the ball valves for HE supply and return and fill the system with water by carefully opening the ball valve for the district heating supply flow and at the sa...

Page 7: ...stem with water retighten all the pipe connec tions because vibrations and shocks during transport and handling may have caused leaks Once the system has been filled with water tighten all the pipe connections once more before performing pres sure test for leaks After heating of the system check all the connec tions and retighten if necessary Please note that the connections may feature EPDM rubbe...

Page 8: ...SMT The outdoor temperature sensor is supplied loose with the unit It is to be mounted on site as shown in the drawings to the right Alwaysmountthesensoronthecoldestsideofthebuilding normally the north side It must not be exposed to morning sunlight and must not be po sitioned above windows doors ventilation ducts balconies under overhanging roof sections or close to any other heat source Installa...

Page 9: ...readed and flanged connections are tightened Differential pressure controller common return pipe only Application A266 The differential pressure controller Danfoss AVP F reduces the high fluctuations in pressure in the district heating network ensuring a small and constant operating pressure across the unit This ensures optimum operating conditions for the control equipment The differential pressu...

Page 10: ...pressure Max pos Venting Vertical pos Constant pressure Max pos Pump Wilo Stratos PARA Yonos PARA system with ECL The pump is factory connected to the ECL controller On systems with ECL controller turn the red switch to the right con stant curve and set it to Max pos initially Then set the pump to the lowest possible position depending on the heating requirement for the building taking into accoun...

Page 11: ...ssioning DHW circuit App A266 Danfoss ECL Comfort 310 Application A266 The substation is supplied with an Danfoss ECL 310 controller The ECL controller is supplied with an ECL Application Key A266 which is adapted to the type of system for which electronic control of the DHW circuit is wanted Note Various applications can be loaded The controller is factory set for local language and the running t...

Page 12: ...er Venting During start up of the heating season always vent the radiator cir cuit heating side the pump and the unit To vent the unit use the air valve pos 17 in the unit Vent the radiator circuit heating side on the bleed screws of the radiators Vent the pump according to instructions in the pump manual Measuresaftermaintenancework After maintenance work and before commissioning Check that all s...

Page 13: ... that all components are intact and functioning as intended In the event of irregularities lack of functionality or visible faults and defects in a component replace the component in questionn Clean all dirt filters strainers in the unit Replace any filters that are not intact Check that any electrical cables are in serviceable condition and that it is possible to disconnect the electrical power s...

Page 14: ...tic components controller incorrectly adjusted or defective or possibly power outage The pump is not working The pump is set at too low speed of rota tion not all system types Air pockets in the system Check that the actor is functioning cor rectly clean the valve seat if necessary Check that the controller setting is cor rect see the separate instructions for the controller Check the power supply...

Page 15: ...onsultation with the water supply company Replace the heat exchanger Long wait for hot water Circulation pump out of order Check whether the pump is running and whether there is a power supply to the pump Make sure that there is no air in the pump housing No hot water Dirt strainer in the district heating sup ply line clogged Defective controller Defective sensor Clean the dirt strainer Check cont...

Page 16: ...00 6 2 2005 Electromagnetic compatibility Generic standard Immunity industry EN 61000 6 3 2007 Electromagnetic compatibility Generic standard Emission for residential commercial and light industry EN 61000 6 4 2007 Electromagnetic compatibility Generic standard Emission industry Machinery Directive 2006 42 EEC EN ISO 14121 1 Safety of machinery Risk assessment EN 60204 1 Safety of machinery Electr...

Page 17: ... with all technical regulations and the applicable legislation in every respect Installation and commissioning must only be performed by trained authorised personnel The unit is checked in the factory for leaks before delivery Leaks are however possible due to vibrations caused by transport hand ling and heating of the system and therefore it is important to check all connections and to retighten ...

Page 18: ...18 Instructions for installation and use S 22 DKDHR VI IE D1 02 Danfoss District Energy ...

Page 19: ...19 19 Instructions for installation and use S 22 Danfoss District Energy VI IE D1 02 DKDHR ...

Page 20: ...Danfoss Redan A S District Energy Omega 7 Søften DK 8382 Hinnerup Tel 45 87 43 89 43 Fax 45 87 43 89 44 redan danfoss com www redan danfoss dk VI IE D1 02 Produced by Danfoss A S 09 2012 ...

Reviews: