background image

1 - introduction

These  instructions  pertain  to  the  Danfoss 

reciprocating  compressors  MPZ,  used  for 

refrigeration  R404A/R507A  systems.  They  are 

intended  to  provide  necessary  information 

regarding safety features and proper handling of 

this product. 

2 - transportation, storage

Check the packaging before use.

Beware  that  all  compressor  handling  must  be  

carried  out  with  caution.  Dedicated  packing  

handles are to be used for all required manipu-

lation of the compressor; otherwise appropriate 

and safe lifting equipment is to be used during 

handling and unpacking. 

Verify that the compressor is never stored in an 

ambient  temperature  below  -35°C  (-31°F)  or 

above 50°C (122°F). 

Ensure that the compressor and its packaging are 

not exposed to rain or corrosive atmosphere. 

3 - safety measures prior to assembly

Ensure that the ambient temperature, around the 

compressor,  never  exceeds  50°C  (122°F)  during 

off-cycle.  Flammable  atmosphere  are  banned.

Make certain that the compressor is mounted onto 

a horizontal plane with a maximum slope of 3°. 

Verify  that  the  power  supply  corresponds  to 

compressor  motor  characteristics  (refer  to  the 

compressor nameplate). 

Ensure  that  refrigerant  charging  equipment, 

vacuum pumps, etc. for HFC refrigerant systems 

have  been  specifically  reserved  for  these 

refrigerants and never used with other CFC, HCFC 

refrigerants.

Use only clean and dehydrated refrigeration-grade 

copper tubes & silver alloy brazing material. 

Verify that all system components are appropriate 

(use of refrigerant, etc.), clean and dehydrated be-

fore being connected to the completed assembly. 

The piping connected to the compressor must be 

configured on the basis of a flexible 3-axis design 

to dampen vibrations.

4 - assembly

When removing the plugs, start with the suction 

connector plug. Take care to gradually release the 

nitrogen holding charge to avoid oil spray.

Connect the compressor to the system as soon as 

possible to avoid oil contamination from ambient 

moisture.

Ensure  that  no  material  enters  into  the  system 

while cutting tubing. Moreover, never drill holes 

in the pipe work after installation.

Exercise  great  care  while  brazing  (use  only  

state-of-the-art practices); vent piping with nitro-

gen gas flow to prevent oxidation. When brazing, 

protect  the  terminal  box  and  painted  surfaces 

of  the  compressor  from  torch  heat  damage.  Be 

sure the required safety and control devices are 

connected to the circuit. 

5 -  leak detection

  Never pressurize the circuit with oxygen or dry 

air in order to avoid the risk of fire or explosion.

Perform a leak detection test on the complete sys-

tem by means of electronic detector after circuit 

pressurization with nitrogen & R404A/R507A.

The low side test pressure must not exceed 25 bar 

g (362 psig). 

Should a leak be discovered, proceed with repair 

steps and repeat the leak detection.

Do not use dye for leak detection.

6 - Vacuum dehydration procedure

Connect the vacuum pump to both the LP & HP 

sides in order to avoid dead-ending system parts.

Pull  down  the  system  under  a  vacuum  of  500 

µm Hg (0.67 mbar). Never use the compressor to  

vacuum the circuit.

Do  not  use  a  megohmmeter  or  apply  power  to 

the compressor while it is under vacuum, as this 

may cause motor burn out.

7 - electrical connections

  Make  sure  the  main  power  supply  to  the  

system has been switched off and isolated. Refer 

to  first  page  for  wiring  connection  details  with 

respect to the various motor codes. 

Note  that  MPZ  compressors  are  protected 

against  excess  current  and  temperature  by  an 

internal overload protector. However the power 

line  needs  to  be  protected  and  the  compressor 

connected to earth. 

All electrical components must be selected as per 

local standards and compressor requirements.

8 - Filling the system

The compressor shall be switched off: the liquid 

refrigerant is charged into the condenser and/or 

liquid  receiver  in  liquid  phase  (compulsory  for 

refrigerant  blends).The  charge  must  be  as  close 

to  the  nominal  system  charge  as  possible  in  

order to avoid both low pressure operations and 

excessive  superheating  at  start-up.  If  possible,  

maintain  the  refrigerant  charge  below  2.5  kg. 

Above  this  limit,  install  a  system,  such  as  a  

pump-down  cycle  or  suction  line  accumula-

tor,  to  protect  the  compressor  against  liquid  

flood-back. 

Never leave the filling cylinder connected to the 

circuit to avoid overfilling.

9 - Verification before commissioning

Ensure  that  all  service  valves,  if  any,  are  in  the 

open position before start-up.

  Check  that  all  safety  devices  are  operational 

and properly set (safety pressure switch set point, 

mechanical relief valve, etc.).Make sure that these 

devices  comply  with  both  generally  and  locally 

applicable regulations and safety standards.

  When  using  high-pressure  switches  or  relief 

valves,  the  setting  must  not  exceed  maximum 

service pressure of any system component. 

A  low-pressure  switch  is  recommended  to  

prevent  operation  under  vacuum.  Use  a  mini-

mum setting of 0.1 bar (1.5 psig). 

Verify that all electrical connections are properly 

fastened  and  in  compliance  with  local  safety  

regulations. 

When a crankcase heater is required (refer to the 

Application Guidelines), ensure that it has been 

energized  for  a  minimum  of  12  hours  before  

initial start-up and/or after prolonged shutdown 

periods. 

10 - start up

Balance the HP/LP pressure before initial start.

As  soon  as  power  is  energized  the  compressor 

must start, whenever it does not, you have only 

few  seconds  to  switch  it  off  in  order  to  avoid 

burn-out of the windings ( possible single phase 

miswiring).

If  the  compressor  does  not  start,  check  voltage 

availability on terminals and wiring conformity.

Note:  when  the  overload  protector  has  tripped 

out, it may take up several hours to reset.

11 - Check up while compressor is running

Check  current  draw,  voltage  and  setting  of  the 

suction superheat to reduce risk of slugging.

In all cases, the application range of the compres-

sor must be respected (see overleaf).

Check refrigerant piping or capillary tubes for ab-

normal vibrations (refrigeration line movement in 

excess of 1.5 mm necessitates corrective actions, 

pipe brackets, etc.). 

When needed, additional refrigerant may be added 

in liquid phase through the low-pressure side and 

as far as possible from the compressor. The com-

pressor must be operating during this process.

Do not overcharge the system. Never release re-

frigerant to atmosphere.

Before leaving installation site, carry out a general 

inspection  of  the  installation:  cleanliness,  noise 

and leak detection.

12 - maintenance

MPZ  compressors  themselves  do  not  necessi-

tate any special periodic maintenance procedure. 

However,  check  proper  operations  and  mainte-

nance  of  the  system  to  prevent  system-related 

compressor problems.

  - Verify that safety devices are operational and 

properly set.

  - Ensure that the circuit is leak tight.

  -  Check  the  current  draw  by  the  compressor 

motor.

  - Check that all electrical connections are still 

adequately fastened.

  -  Make  sure  the  compressor  is  clean  and  in 

good  working  order;  verify  the  absence  of  rust 

and  oxidation  on  the  compressor  shell,  piping 

and electrical connections.

  - Insure that periodic in-service inspections re-

quired by local regulations are performed.

 Internal pressure and surface temperature in-

volve  permanent  risk  for  maintenance  operator 

and  require  appropriate  skills  and  tools. Tubing 

temperatures  may  exceed  100°C  (212°F)  and 

could cause severe body burns.

13 - warranty

The compressor manufacturing date is printed on 

the nameplate. Ensure that the model and serial 

number  information  is  always  transmitted  with 

any claim filed regarding this product.

Be aware that the product warranty may be void 

in the following cases:

  •  External  modifications  to  the  compressor 

(absence of nameplate, drilling, welding, broken 

feet, shock marks), 

  • Compressor opened by the customer or retur-

ned unsealed. 

  • Presence of rust or water inside the compressor.

  •  Addition  of  leak-detection  dye  in  the  lubri-

cant, use of a refrigerant or lubricant not appro-

ved by Danfoss.

  •  Any  deviation  from  recommended  instruc-

tions  pertaining  to  installation,  application  or 

maintenance, 

  •  Use  in  mobile  applications  (boats,  trains, 

trucks...)  or  under  explosive  atmospheric  envi-

ronment (the compressor connecting box is not 

explosion-proof). 

  • No model number or serial number transmit-

ted with warranty claim.

14 - replacement

Danfoss  recommends  not  to  throw  away 

a  used  compressor  but  to  dispose  of  the 

compressor  and  its  oil  at  a  specialised  

recycling company site. 

8510234P03    © Danfoss Commercial Compressors 09/07