 Intelligent Purging System (IPS 8) Ammonia

3 | BC437120335698en-000101

© Danfoss | Climate Solutions | 2023.07

Mechanical / Refrigeration 

check

Electrical check

1) Verify that IPS 8 purger is installed, wired, and piped as per Danfoss instructions

2  )Horizontal alignment requirements must be within 2 degrees to IPS top cover. See Fig. 1

3  )The purger unit should be always kept in an upright position - from receipt to final 

  installation, including possible lift to a high final location. See Fig. 2

4) Leave space around IPS for air circulation flow. Do not install it right up to a wall. See Fig. 3

5) Inspection of possible dirt in gas lines. See Fig. 4

    a. For purge point connect gas line a slope towards the IPS8 purger, must be observed. 

    b. No liquid traps

6) Remember to remove rubber plug. See Fig. 5.

7) Carry out proper vacuum on the purge point connect gas line and R717 side of IPS 8 purger.    

  The R717 side of IPS 8 purger must be pressurized prior to the IPS 8 being put into operation. 

8) Before connecting power supply to IPS let it stand upright for min. 6 hours after it has been    

  placed at its final location

9) After mechanical installation, but before connecting power supply IPS, please check:

    a. If Danfoss drain valve used (Type SV or ICF with ICFD), then check:

    b. SV: See Fig. 6a

      i.  Check throttle valve 

A

 is opened, and SV is properly assembled.

      ii. Check that port 

B

 is closed by bolt. 

    c.  ICFD: See Fig. 6b

      i.  Check stop valves

      ii. Check coil is installed on solenoids (Solenoid for ICF w/ICFD (DO6) – if used)

10) Open stop valves 

D

, as we have vacuumized the pipes before. Open manually one of purge    

    point solenoids 

E

. See Fig. 6a and 6b 

 

    For general mechanical installation guidance/practice. See Fig. 6c

11) Check Main power supply. See Fig. 7

 

a. 084H5001, IPS 8: 230 V, AC 50 Hz

 

b. 084H5002, IPS 8: 230 V, AC 60 Hz

 

c. Power to be connected to Main switch: QS1 and Terminal: XT0

 

  i.  Terminals on QS1

 

1. 3, L2 – Line phase 

 

2. 1, L1 – Neutral

 

  ii. Terminal XT0

 

1. PE – Earth

12) Check connections to field connected Purge point solenoids and ICFD solenoid (if used) 

 

See Fig. 8a and 8b 

 

  a. Coils voltage. Same as Main power supply. No further action needed. 

 

  b. At different voltage for field connected solenoids coils. See Fig. 9

Summary of Contents for IPS 8

Page 1: ...Start up guide IPS 8 CE 230V AC 1ph 50Hz code 084H5001 IPS 8 230V AC 1ph 60Hz code 084H5002...

Page 2: ...onia BC437120335698en 000101 2 Danfoss Climate Solutions 2023 07 Contents Mechanical Refrigeration check 3 Electrical check 3 IPS controller MCX15B2 setup 4 IPS MCX controller Quick start 6 Lifting Pr...

Page 3: ...fore connecting power supply to IPS let it stand upright for min 6 hours after it has been placed at its final location 9 After mechanical installation but before connecting power supply IPS please ch...

Page 4: ...cuit breakers 13 Switch ON a QS1 QM2 and QM4 See Fig 10 14 Before start of compressor temperatures needs to be checked Should all be within 1 K OK if OK then go to 15 If Temperatures are not within 1...

Page 5: ...As compressor is in operation pressure and temperature is changing after about 15 25 minutes we should observe changes as reflected on below screens See development below from left to right If the co...

Page 6: ...ny Purge points which is connected a Navigate from the Main Menu to Start by Enter b Select Main Switch OFF c Go to Main Menu d Navigate from the Main Menu to Login e Enter password 200 f Choose Param...

Page 7: ...ot to wait to IPS internal time cycle between purge points See steps below for how to navigate to the parameter in question 1 Navigate from the Main Menu to Start by Enter 2 Enter password 200 3 Choos...

Page 8: ...ions 2023 07 Fig 1 It is important that the support construction is level to ensure the internal liquid trap is properly filled Angle to horizontal 2 degrees Lifting Procedure Fig 2 All 4 lifting eyes...

Page 9: ...s Service platform For easy access to the main switch and servicing the Purger unit shall be installed between 0 05 to 1 1 m 2 to 43 in above service platform level Min 900 mm 1051 mm Min 500 mm 32 mm...

Page 10: ...e to water bath Do not unscrew restrictor inside pipe Risk of purging high NH concentration Enclosed weld flange fig 14 547 8 x 011 mm hole 274 416 4 198 310 155 Connection points Fig 4 Multi point pu...

Page 11: ...User Guide Intelligent Purging System IPS 8 Ammonia 11 BC437120335698en 000101 Danfoss Climate Solutions 2023 07 Fig 6a...

Page 12: ...stem IPS 8 Ammonia BC437120335698en 000101 12 Danfoss Climate Solutions 2023 07 Fig 6b ICF 20 4 with ICFD Solenoid coil to be connected in IPS Electrical panel to Terminal Block QG XT2 Terminal number...

Page 13: ...stem IPS 8 Ammonia 13 BC437120335698en 000101 Danfoss Climate Solutions 2023 07 Classified as Business C C Cl l la a ass ss ssi i ifi fi fie e ed d d a a as s s B B Bu u us s si i in n ne e es s ss s...

Page 14: ...Ammonia BC437120335698en 000101 14 Danfoss Climate Solutions 2023 07 Classified as Business C C Cl l la a ass ss ssi i ifi fi fie e ed d d a a as s s B B Bu u us s si i in n ne e es s ss s s QM3 for X...

Page 15: ...DO6 3 and 4 Purge valve no 1 DO7 5 and 6 Purge valve no 2 DO8 7 and 8 Purge valve no 3 DO9 9 and 10 Purge valve no 4 DO10 11 and 12 Purge valve no 5 DO11 13 and 14 Purge valve no 6 DO12 15 and 16 Pur...

Page 16: ...1 Thermal magnetic miniature circuit breaker Compressor Condenser Extraction Air Fan Crankcase Heater QM2 Thermal magnetic miniature circuit breaker 24 V DC for MCX15B2 I O Front panel lights and Main...

Page 17: ...17 BC437120335698en 000101 Danfoss Climate Solutions 2023 07...

Reviews: