background image

6 | © Danfoss | Produced by Danfoss Redan A/S | 2020.02

Reach

All products of the EvoFlat series comply with the provisions of the REACH

regulation.

We are therefore obliged to inform our customers about the presence of

substances according to the SVHC candidate list, if they are present. We 

hereby inform you: This product contains brass parts containing lead (CAS

7439-92-1) in a concentration above 1% (w/w).

Potential equalization / grounding

Equipotential bonding is understood as all measures for eliminating electri-

cal potential differences (contact voltages), which can occur between eg 

two pipelines. Equipotential bonding is an important measure for protec-

tion against electric shock. Equipotential bonding reduces corrosion in the 

heat exchanger, instantaneous water heaters, district heating stations and 

plumbing installations.

 Equipotential bonding should be in accordance with 

the provisions 60364-4-41: 2007 and IEC 60364-5-54: 2011.

Binding point is marked with a grounding symbol on the bottom right corner 

of the mounting plate and there is a hole in the mounting plate and a label 

with grounding symbol.

Disposal

The station consists of materials that must not be disposed of with house-

hold waste. Disconnect the entire energy supply and disassemble the prod-

uct for disassembly and dispose of it in accordance with local regulations.

Please notice

Interventions and reworking of our components lead to 

the loss of warranty.

Montage- und Betriebsanleitung / Mounting and Operating guide   

EvoFlat Reno

Summary of Contents for EvoFlat Reno

Page 1: ...rmen For replacement of gas boilers F r den Austausch von Gasthermen in Wohnungen und Mehrfamilienh usern For replacement of gas boilers in apartment buildings and multi family houses EvoFlatRenoWohnu...

Page 2: ...gelkomponente Controls 15 11 0 Wartung Maintenance 18 12 0 Allgemeine Fehlersuche General trouble shooting 19 13 0 Probleml sung PWH Versorgung Trouble shooting DHW supply 19 14 0 Probleml sung Heizun...

Page 3: ...werden so hat dies unter trockenen und beheizten Bedingungen zu erfolgen Relative Luftfeuchtig keit max 80 und Lagertemperatur 5 70 C Die Fernw rmestationen d rfen nicht h her als imWerk gestapelt we...

Page 4: ...hutz gegen elektrischen Schlag PotentialausgleichreduziertKorrosionimW rmetauscher Durchlauferhitzer Fernw rmestationen und Sanit rinstallationen Gem DIN VDE 0100 410 ist ein Potentialausgleich nach D...

Page 5: ...istance immediately Storage Before installation the units must be stored in a dry heated i e frost free room Relative humidity max 80 and storage temperature 5 70 C The units must not be stacked highe...

Page 6: ...measure for protec tion against electric shock Equipotential bonding reduces corrosion in the heat exchanger instantaneous water heaters district heating stations and plumbing installations Equipotent...

Page 7: ...atte Beschriftung Jeder Anschluss der Station ist beschriftet Vor dem Einbau Reinigen und sp len Vor der Installation sollten alle Rohre und Anschl sse der Station gereinigt und gesp lt werden Nachzie...

Page 8: ...lean and rinse Prior to installation all substation pipes and connections should be cleaned and rinsed Thightening Due to vibration during transport all substation connections must be checked and tigh...

Page 9: ...r Anschluss Die Station muss an einen 230V AC Anschluss und an einem Potentialaus gleich angeschlossen werden Bemerken Sie bitte dass die EvoFlat Reno in 12 Varianten erh ltlich sind von welchen 6 Var...

Page 10: ...ltwassersowie Vor und R cklauf der Sekund r Heizkreise ohne gro eVer nderungen weiter verwendet werden k nnen empfiehlt es sich die Anschl sse f r den prim rseitigen Heizwasservorlauf und r cklauf dur...

Page 11: ...ter HEX 230 V Anschluss Edelstahl aufgel teter HEX 230 V Anschluss Kupfer aufgel teter HEX 230 V Anschluss Trafo f r 24 V Ausgangspannung Edelstahl aufgel teter HEX 230 V Anschluss Trafo f r 24V Ausga...

Page 12: ...orlauf Supply HE R cklauf Return M 2 Plattenw rmetauscher PWH Plate heat exchanger DHW 5 Schmutzf nger Strainer 7 Kugelhahn 3 4 Ball valve 3 4 17 Entl ftung Air valve 19 Entleerventil mit Schlaucht ll...

Page 13: ...ded over to copied or used by third party Two or three dimensional reproduction of contents to be authorized by Danfoss Redan A S No Evoflat Reno Rev Sheet 1 1 Designation Replace Design 11 07 2018 HM...

Page 14: ...oto 2 3 1 2 3 Rohrsatz Pipe set F r Anschluss oben For connection upwards Abdeckhaube Cover Wei e Abdeckhaube White cover 1 2 3 F r die EvoFlat Reno Stationen ist eine wei e Abdeckhaube PROTO 854 Foto...

Page 15: ...ieb selbst st ndig Ein gut sichtbarer Positionsgeber zeigt an ob das Ventil ge ffnet oder geschlossen ist Entl ftung Die Station sollte w hrend der Inbetriebnahme entl ftet werden TPC M multi function...

Page 16: ...ig von autorisierten Fachkr ften gereinigt werden Die H ufigkeit der Reinigung ist von den Betriebsbedingungen abh ngig Strainer Strainers should be cleaned regularly by authorized personnel The freq...

Page 17: ...ler m ssen unbedingt s mtliche Gewindeanschl sse berpr ft und festgezogen werden Fitting piece The flatstation is equipped with a fitting piece for energy meter Mounting of energy meters 1 Close ball...

Page 18: ...der Station angeben Maintenance and inspection work at the station in accordance with these instructions should be carried out regularly and should in clude the following Strainers Cleaning of straine...

Page 19: ...geschlossen Ist der Filter der WQ Vorlaufleitung sauber Ist die Vorlaufleitung sauber Ist der Druckunterschied gleich oder h her als der normale lokale Druckunterschied im WQ Netzwerk Fragen Sie im Zw...

Page 20: ...ntile Pr fen austauschen Ungleichm ssige W rmeverteilung im Geb ude weil die Ausgleicschventile vorhanden sind Ausgleichsventile einstellen einbauen Durchmesser der Zulaufleitung zur Leitungsabmessung...

Page 21: ...dass die W rme gleichm ssig ber die ganze Heiz fl che verteilt wird alle Heizk rper aufdrehen und verhindern dass die Heizk rper im System unten zu hei werden Es ist sehr wichtig die Tem peratur im V...

Page 22: ...eplace Uneven heat distribution in building because of incorrectly set balancing valves or because there are no balanc ing valves Adjust install balancing valves Diameter of pipe to flat station too s...

Page 23: ...istributed evenly across the full heating sur face open all radiators and keep the radiators in the system from heating up at the bottom It is ex tremely important to keep the sup ply temperature to t...

Page 24: ...24 Danfoss Produced by Danfoss Redan A S 2020 02 145X2025 AN33376446555601 000101 15 EU GUTACHTEN EU DECLARATION OF CONFORMITY Montage und Betriebsanleitung Mounting and Operating guide EvoFlat Reno...

Page 25: ...u berspannen da dies zu Undichtigkeiten f hren kann Der Hersteller bernimmt keine Haftung f r Leckagen die aus berspannung zur ckzuf hren sind Von dem Installateur auszuf llen Diese Anlage wurde nachg...

Page 26: ...26 Danfoss Produced by Danfoss Redan A S 2020 02 145X2025 AN33376446555601 000101 Montage und Betriebsanleitung Mounting and Operating guide EvoFlat Reno...

Page 27: ...Montage und Betriebsanleitung Mounting and Operating guide EvoFlat Reno Danfoss Produced by Danfoss Redan A S 2020 02 27 AN33376446555601 000101 145X2025...

Page 28: ...28 Danfoss Produced by Danfoss Redan A S 2020 02 145X2025 AN33376446555601 000101 dk...

Reviews: