5.6 Mount EPP cover
To install heat and water meters, the insulation must be removed in the order 1, 2 and
3 and reassembled in the reverse order.
5.7 Fitting piece
The flatstation is equipped with a steel fitting piece for energy meter and brazz fitting
piece for cold wather meter.
Mounting of energy meters:
1: Close ball valves
Close the ball valves on DH Supply and DH Return, if there is water on the system.
2: Loosen nuts
(see pictures)
Loosen the nuts on the fitting piece.
3: Remove fitting piece
Remove the fitting piece and replace it with the energy meter. Do not forget the
gaskets.
4: Tighten connections
After mounting of the energy meter remember to check and tighten all threaded
connections.
5: Torques for connections at the Flatstation
Union nuts G 3/4”
45 Nm
Union nuts G 1”
45 Nm
Screw connections for fitting pieces
35 Nm
Piping of the heating circuit distributor
30 Nm
Note: When installing a heat and / or water meter, the respective manufacturer’s instruc-
tions must be observed.
After both meters have been installed, the wiring of the heat meter to the calculator
must be laid (clamped) in the cable bar provided for this purpose. It is important to
ensure that no cables cross the insulating bars. Otherwise, there will be an uncontrolled
leakage of heat and the room may heat up unnecessarily.
Summary of Contents for EvoFlat 4.0 M
Page 2: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ...48 Danfoss DCS SGDPT 2022 01 AN40274706699301 010101 ...