User Gu
Energ
Earni
CO
2
a
Peak
6.1.8
Plant
mont
Energ
Earni
CO
2
a
Peak
C
6.2.
Site p
the in
6.2.1
To co
where
neede
uide
DLX UL series
gy
ings
avoided
k Power
8.2.
Plant
displays a su
th, this year a
gy
ings
avoided
k Power
Connec
performance c
nverter and th
Witho
.
nnect the inv
e the networ
ed.
F
NOTIC
With se
be attac
L00410625-01
t
ummary of th
nd in total sin
ction be
can be monit
he computer
out a Net
verter directly
k card in the
Figure 6.12: Conn
CE
veral inverte
ched to the
m
Inverter’s total
Cash value of th
Avoided CO
2
em
Inverter’s larges
e most impo
nce
Start Up
.
Plant’s total ene
Cash value of th
Avoided CO
2
em
Plant’s largest i
tween I
tored remote
can be confi
twork
y to a compu
computer do
nection without n
rs connected
master
inverte
energy product
he feed-in energ
missions [kg/kW
st instantaneou
rtant statistic
ergy production
he feed-in energ
missions [kg/kW
nstantaneous a
Inverter
ely by using a
gured direct
uter a standar
oes not supp
network
d together via
er only.
tion [kWh]
gy in currency/k
Wh] compared to
us amount of po
cs of the PV p
n [kWh]
gy in currency/k
Wh] compared to
amount of powe
r and PC
a computer. T
ly or via a net
rd Ethernet c
ort
Autosense
a CAN bus, th
kWh
o fossil fuel
ower production
plant from tod
kWh.
o fossil fuel
er production [W
C
The connectio
twork.
cable is requir
e
, a crossove
1.
Follo
2.
Mast
3.
CAN
4.
Ethe
5.
RS-4
6.
Com
7.
Data
he Ethernet ca
6
n [W]
day, this
W]
on between
red. In cases
r cable is
ower inverter
ter inverter
bus cable
ernet cable
485 cable
mputer
a logger
able should
67